<br />7A <br />ATTACHMENT 2 Page 8 <br /> <br />Shoreway Recycling and Disposal Center Masterplan <br />Critical Milestones <br /> <br />Date <br />March 22, 2007 <br /> <br />Kev Item/Milestone <br />Informational report to update the Board on the Shoreway Recycling <br />and DiSposal Center (SRDC) master plan work and seek Board input on <br />final master plan concepts. Input from this Board meeting, along with <br />some pending related work efforts, will be used to recommend a <br />preferred master plan alternative for consideration at the April 26, 2007 <br />Board meeting. <br /> <br />April 26, 2007 <br /> <br />Board approval of a master plan preferred alternative consisting of <br />the materials recovery facility (MRF) Alternative 2 plus the transfer <br />station site improvements to address traffic improvements, self haul <br />tipping, and improved safety and service convenience for public buyback <br />and drop-off recycling. ~n total, these projects will comprise a "preferred <br />master plan alternative. <br /> <br />September 27,2007 Board approval to begin work scope and cost negotiations with the <br />Design team of JR Miller/HDR Engineering for the Shoreway <br />Environmental Center improvements. <br /> <br />October 25, 2007 Board approval of the JRMA scope and budget for the architectural <br />and engineering work for the Shoreway Recycling and Disposal Center <br />(SRDC) masterplan. JRMA scope of work includes the completion of the <br />facility design programming, production of architectural and engineering <br />drawings that will serve as the basis for construction bidding, and <br />construction services administration. <br /> <br />November 1, 2007 Shoreway facility operations RFP released, which included conceptual <br />site plans for masterplan improvements. <br /> <br />February 11, 2008 Conditional Use Permit application submitted to the City of San Carlos <br />for Shoreway masterplan improvements. <br /> <br />March 4, 2008 Seven proposals received in response to the facility operations RFP. <br />. These proposals included firm cost proposals for the purchase and <br />installation of single stream processing equipment. This is the first time <br />the SBWMA had such firm cost proposals. <br /> <br />April 26, 2008 Staff presentation and report on the SRDC. This detailed an updated <br />analysis of the financing plan for the Shoreway Environmental Center (the <br />new name for the SRDC after the <br />