My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-09-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-09-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2008 1:08:15 PM
Creation date
9/4/2008 3:01:29 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Closed
Agency Type
City Council
Date
9/8/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7A <br />ATTACHMENT 3Page 10 <br /> <br />SHOREWAY CAPITAL PROJECT <br />COST ESTIMATE <br /> <br />JUNE 2008 <br /> <br />Estimated <br />Current <br />~ <br /> <br />BASE <br />Scale House & traffic improvements, Transfer <br />Station & MRF Buildings <br />Construction Management <br /> <br />34,322,800 (1) <br />1,859,500 (2) <br /> <br />Building sub-total <br /> <br />MRF Equipment Purchase <br />MRF Equipment Installation (3) <br /> <br />TOTAL BUILDING & EQUIPMENT <br /> <br />$36,182,300 <br /> <br />15,000,000 <br />2,779,000 <br />$53,961,300 <br /> <br />ADD <br />Additional Contingency @ 10% <br /> <br />Estimated <br />Maximum <br />COST <br /> <br />34,322,800 <br />1,859,500 <br /> <br />$36,182,300 <br /> <br />15,000,000 <br />2,779,000 <br />$53,961,300 <br /> <br />$5,396,130 <br /> <br />TOTAL PROJECT $53,961,300 $59,357,430 <br /> <br />(i) The June building cost estimate includes "soft costs" for planning, building, and LEED fees; and <br />other construction costs such as landscaping, site slgnage, PG&E transformer, repainting the <br />exterior of the transfer stallon, transfer station roof replacement, telecom and security, and <br />education center, etc. <br />(2) Includes JRMA design fees during construction. <br /> <br />(3) Assumes the SBWMA separately bids out and oversees this work. SBWMA to prequalify firms. <br />The costs were adjusted for inflation from 2008 dollars to 2010 dollars wtlen installation will <br />occur. <br />
The URL can be used to link to this page
Your browser does not support the video tag.