Agmt08 Pleasanton Engineering Contractors, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Pleasanton Engineering Contractors, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2010 12:43:25 PM
Creation date
9/4/2008 4:39:12 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Pleasanton Engineering Contractors, Inc
PROJECT NAME
Veterans Boulevard Storm Drain Pump Station
RMP File Number
304
Date
8/21/2008
MO Ref
08-138
Box
7062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> <br />A. Contractor shall complete the Work within the following Schedule reflecting <br />the date the Contract Time commences to run as set forth in Section 00550 <br />(Notice to Proceed) and Section 00700 (General Conditions); and <br /> <br />1. Contractor shall achieve Substantial Completion of the Work within <br />ninety (90) Calendar Days from the date the Contract Time commences <br />to run. <br /> <br />B. Liquidated DamaQes <br />1. City and Contractor recognize that time is of the essence of this <br />Agreement and that City will suffer financial loss in the form of lost <br />revenues, contract administration expenses (including project <br />management and consultants' expenses), delay and loss of public <br />use, if the Work is not completed within the time specified in <br />paragraph II I. A. 1 above plus any extensions thereof allowed in <br />accordance with the Contract documents. Consistent with Section <br />00700 (General Conditions), Contractor and City agree that because <br />of the nature of the Project, it would be impractical or extremely <br />difficult to fix the amount of actual damages incurred by City because <br />of a delay in completion of the Work. <br /> <br />2. Accordingly, City and Contractor agree that Contractor shall pay City <br />Five Hundred and No Dollars ($500.00) for each Day that expires <br />after the time specified in Paragraph 1I1.A.1 of this Section 00520 for <br />Contractor to achieve Substantial Completion, until such date as <br />contractor achieves Substantial Completion. <br /> <br />C. Liquidated damages for delay shall only cover and be in lieu of the actual <br />damages suffered by City as a result of delay referenced above. Liquidated <br />damages shall not cover the cost of completion of the Work, damages <br />resulting from defective work, cost of temporary replacement facilities, <br />damages suffered by others who then seek to recover their damages from <br />City (for example, delay claims of other contractors or subcontractors), and <br />defense costs thereof. <br /> <br />IV. CITY'S ENGINEER AND REPRESENTATIVES <br />Reserved <br /> <br />V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> <br />In order to induce City to enter into this Agreement, Contractor makes the following <br />representations and warranties: <br /> <br />A. Contractor has visited the Site and has examined thoroughly and <br />understood the nature and extent of the Work, Site, locality, actual <br />conditions, as built conditions, and all local conditions and federal, state and <br />local laws and regulations that in any manner may affect cost, progress, <br />performance or furnishing of Work or which relate to any aspect of the <br />design and the means, methods, techniques, sequences or procedures of <br />construction to be employed by Contractor and safety precautions and <br />programs incident thereto. <br /> <br />VETERANS BOULEVARD STORM DRAIN <br />PUMP STATION ELECTRICAL UPGRADE PROJECT <br />