My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-11-10 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-11-10 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2008 4:43:09 PM
Creation date
11/6/2008 4:00:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
11/10/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />ATTACHMENT2 7A <br />5 <br /> <br />ACTION PLAN (Draft) <br />Provides a framework for advancing projects to implementation and further project development (engineer analysis). <br />IMPLEMENTATION City Traffic Cost Potential Impacts <br /> Benefits <br /> Change Reduce Visual NoIse Env ROW <br /> Proposed Improvements In Con- lceal <br /> gestioo traffic <br /> , <br />Smart CorridOrS -Intelligent Transportation Systems (rrS) and Traf-I All @ @ @ <br />flc Incident Management $-$$ <br />Willow Road operational improvements and ITS - Signal timing dur- EPA, <br />ing peak periods, exiVentrance right turn pockets. or prohibit left MP @ @ $ 0 @ <br />turn during peak periods <br />Unl~ Avenue operational improvements and ITS - Signal tim- EPA <br />iog during peak periods. exil./entraoce right turn pockets, or pro- @ @ $ 0 @ <br />hibit left turn during peak periods} <br />Hwy 101/ University Interchange impl'Ovemen1s (WeSt side) - EPA @ @ <br />Phase 2 improvements and bike/pedestrian facility $$-$$$ varies varies varies varies <br />Residential traffic management elements incorporated into cap.ital EPA. . . <br />projects - To be included as part of capital projects All $ <br />ADDITIONAL ENGINEERING ANALYSIS City Traffic Cost Potential Impacts <br /> Benefits <br /> Change Reduce VISual NOise Env ROW <br /> Proposed Improvements irtCon- local <br /> gestlon trafflc <br />Reconstruct Embarcedero/Oregon interchange. Includes consid- MV, @ @ @ @ @ @ <br />erations for Bike/Ped lanes PA U$ <br />Reconstruct San Antonio interchange. MV. . @ @ @ @ <br /> PA $$$ <br />Grade Separations at Bayfront Expwy/Willow and Bayfront Expwy/ EPA, . @ . . @ @ <br />UnivefSity MP $$$$ <br />Direct ffyover connection between Bayfront Expwy/MalSh and Hwy MP. @ @ 0 @ @ 0 <br />101 north of Marsh RWC $$$ <br />Willow Road (east of Hwy 101) - Separate local and regional traffic EPA. . varies <br /> MP varies $$$$ varies varies varies <br />University Ave (east of Hwy 101) - Separate local and regional traf- 1 EPA. . varies varies <br />fic ! MP varies $$$$$ varies varies <br />Hwy 101/ University Interchange improvements (East side) EPA <br /> @ @ $$-$$$ varies varies vanes va ries <br /> <br /> <br />2020 Peninsula Gatewa Corridor Stud <br /> <br />July 2008 DlIAFT <br />
The URL can be used to link to this page
Your browser does not support the video tag.