Laserfiche WebLink
<br />Either Kevin Krajewski or Derek Wurst will install the flow meters for this project. V&A is committed to <br />completing this project in a thorough and timely manner with staff that is experienced and focused on the <br />project requirements. <br /> <br />Hourly Rates: The V&A Fee schedule is shown as an attachment at the end of this document. <br /> <br />Project Schedule: V&A is prepared to meeting the scheduling requirements as described in the Scope of <br />Work (shown below under Scope of Work). Important scheduling milestones are shown as follows: <br /> <br />Site Reconnaissance of metering sites: <br />Documentation of Field Reconnaissance: <br />Approval of Sites by City (if changes are required): <br />All meters and rain gauge installed and operating: <br />First data batch reported to City: <br />Meters Removed: <br />Final Report: <br /> <br />November 19, 2008 <br />November 21, 2008 <br />November 29, 2008 <br />December 4, 2008 <br />December 14, 2008 <br />February 4,2009 <br />February 25, 2009 <br /> <br />Proposed Hours and Cost: The hours and cost are shown in a table which immediately follows the <br />detailed scope of work for the subject services: <br /> <br />SCOPE OF WORK <br /> <br />The following is our detailed scope of work for the project services. This scope of work was developed as <br />a result of our review of the request for proposal and represents our mutual understanding. <br /> <br />Task Description <br /> <br />1. Field Reconnaissance and Document Review: V&A will review available plans and documents, and <br />conduct field reconnaissance of the proposed flow monitoring sites identified by the City. The purpose of <br />the reconnaissance will be to assess hydraulic conditions, manhole access, traffic control requirements, <br />and safety issues for each site. Any modifications to the proposed meter sites will be submitted to the City <br />for review and approval by the City. Deliverable: Documentation of site reconnaissance and final flow <br />monitoring sites will be submitted to the City within 3 days after site reconnaissance. <br /> <br />2. Installation I Calibration I Maintenance I Removal of Flow Monitors: V&A will install 7 flow meters <br />and one rain gauge for a period of 60 days starting no later than December 4, 2008, with an option to <br />extend the monitoring on a weekly basis up to one additional month. The flow meters will be area- <br />velocity type capable of measuring flows and flow depths under surcharge conditions. Pipe diameters <br />will range from approximately 8 to 15 inches. Rain gauges will be tipping bucket type capable of <br />recording to 0.01 inches. The flow monitoring locations are listed as follows: <br /> <br />i. Veterans Boulevard and Chestnut Street (30") <br />ii. Veterans Boulevard and Chestnut Street (33") <br /> <br />~V&A <br />