My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-12-15 Clsd and Spec
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-12-15 Clsd and Spec
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2008 12:58:35 PM
Creation date
12/11/2008 2:38:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/15/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c. Disposal of Surplus Fire Apparatus. <br /> <br />Recommendation: <br />Approve by motion the designation of two fire apparatus as surplus and authorize <br />staff to sell the items per City procedure. Minute Order 08-145 <br /> <br />D. Professional Services Agreement between the City of Redwood City and Split <br />Rock Studios. <br /> <br />Recommendation: <br />Approve by motion the Professional Services Agreement with Split Rock Studios <br />for $277,000 to provide museum quality, interactive exhibits for the Redwood <br />Shores Library Interpretive Center. Minute Order 08-146 <br /> <br />E. Cost sharing agreement with the South Bayside System Authority for <br />improvements to the Redwood Shores Levee Segment III. <br /> <br />Recommendation: <br />Approve, by motion, the proposed cost sharing agreement with the South Bayside <br />System Authority (SBSA) for improvements to the Redwood Shores Levee <br />Segment III and authorize the City Manager to execute the same. <br />Minute Order 08-147 <br /> <br />F. Construction Management Services for the Redwood City Recycled Water Project <br />- Phase I - Redwood Shores Distribution System - Bid Package 9. <br /> <br />Recommendation: <br />Approve, by motion, a professional services agreement with CSG Consultants, Inc. <br />of San Mateo to provide construction management services for the Redwood City <br />Recycled Water Project - Phase I - Redwood Shores Distribution System - Bid <br />Package 9 - [Island Drive and Bridge Parkway (In Westport Office Park) not to <br />exceed $234,006.00]. Minute Order 08-148 <br /> <br />6.2 Section - Final Acceptance <br /> <br />A. Final Acceptance - 2006-2007 Street Overlay Project (Alameda de las Pulgas - <br />Bay Road - Florence Street). <br /> <br />Recommendation: <br />Accept, by motion, the 2006-2007 Street Overlay Project (Alameda de las Pulgas - <br />Bay Road - Florence Street) and authorize the release of bonds and retention <br />according to City procedures. Minute Order 08-149 <br /> <br />REGULAR CITY COUNCIL MEETING <br />MINUTES <br /> <br />JULY 28, 2008 <br />PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.