My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 Field Turf Builders, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Field Turf Builders, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2010 12:34:12 PM
Creation date
12/11/2008 5:03:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
FieldTurf Builders, LLC
PROJECT NAME
Hoover Synthetic Turf Field Replacement Project
RMP File Number
304
Date
12/29/2008
Reso Ref
14909
Box
7062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />NOW, THEREFORE, based on the exchange of valuable consideration, the receipt <br />and sufficiency of which are hereby acknowledged, and based on the Recitals set forth <br />above which form a part of this Agreement, the Surety and Owner agree to the following <br />terms and conditions: <br /> <br />II. <br />TERMS AND CONDITIONS <br /> <br />1. Recitals. The above recitals are contractual and not merely recitals, and <br />the agreements contained herein and consideration transferred are to satisfy rights and <br />obligations between the Owner and the Surety. <br /> <br />2. Incorporation of the General Contract. The General Contract is <br />incorporated by reference into this Agreement, including, without limitation, the General <br />Contract terms and conditions, the Plans or Drawings, any Special Conditions, the <br />Specifications, and the Contract Documents as defined therein, as well as all addenda, <br />amendments, change orders and modifications to those documents issued in accordance <br />with the General Contract. <br /> <br />3. Remainina Work. The Remaining Work includes all of the uncompleted <br />Work, Work needed to be corrected or repaired or completed, other Work included in the <br />General Contract, and Contractor's other obligations under the General Contract. As used <br />in this Agreement, the term "Work" shall be as defined in Section I.A. of the General <br />Contract, and shall include all of Contractor's obligations under the General Contract.] <br /> <br />4. The Current Contract Sum. The Owner represents that as of the date of <br />this Agreement, the current estimated Contract Sum as defined in the General Contract is <br />$946,575.20 ("Contract Sum"), which includes Change Orders 1-3, in the sum of <br />$41,128.20. The amount paid to Contractor prior to the date of this Agreement was <br />$220,837.50, not including statutory retainage. <br /> <br />5. Prior and Future Payments. Owner represents that, as of the date of this <br />Agreement, Contractor has been paid the above amount through Payment Request <br />NO.2 under the General Contract, and that the Owner is presently holding accrued <br />retainage of $24,537.50 under the General Contract. Surety acknowledges that these <br />amounts are correct. Future payments under the General Contract and this Agreement <br />shall be subject to the Owner's quantification and approval of the Work as provided under <br />the General Contract and consistent with the terms of the General Contract and <br />satisfaction of all other contractual requirements imposed by the General Contract as a <br />condition precedent to such payments, and shall be further subject to any with holdings by <br />Owner made pursuant to the stop notice law, the prevailing wage law, and any other <br />applicable federal, state or local regulations. <br /> <br />TAKEOVER AGREEMENT - Page 2 of 9 <br />{7672.005-00232947; 1} <br /> <br />1175334v6 33786/0010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.