My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 Moffatt & Nichol
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Moffatt & Nichol
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2009 12:10:21 PM
Creation date
12/16/2008 9:41:53 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Moffatt & Nichol
PROJECT NAME
Consultant Engineering Services - Redwood Shores Levee
RMP File Number
304
Date
12/1/2008
MO Ref
08-213
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br />":;-" <br /> <br />Grace Le, Redwood City <br />Redwood Shores Levee Proposal <br />r <br />Page 2 <br /> <br />~.kt <br /> <br />still water level, wave crest, and wave runup. Develop 95% confidence limits for the still <br />water level. <br /> <br />4. Develop flood hazard levels based on the peak still water level, wave crest, and wave <br />runup. <br /> <br />5. Document approach and results. <br /> <br />Task 2: Permit Assistance (Allowance) <br /> <br />This task is to provide assistance to the Huffman-Broadway Group (HBG) with procuring permits <br />for levee improvements. Specific tasks will include providing a project description for use in the <br />Army Corps, BCDC and Water Board permit applications, providing permit graphics and <br />quantities of excavation and fill, and coordinating with agencies as requested by the City and <br />HBG. <br /> <br />Since it is difficult to estimate a level of effort associated with procuring permits, we are <br />recommending an allowance be set aside for this task. The labor and materials expended for this <br />Task will be clearly detailed in our invoices, and all effort will be limited to permitting tasks only. <br /> <br />FEE & SCHEDULE <br /> <br />An estimate of hours by task is shown below. We will invoice monthly based on Time and <br />Materials. <br /> <br />Task Labor Fee <br /> ($185/hr) <br />Task 1: Supplemental Coastal Engineering Analysis <br />1. Wave transformation analyses 24 $4,440 <br />2. Empirical Simulation Technique analysis (EST) 40 $7,400 <br />3. Generalized Extreme Value Analysis 16 $2,960 <br />4. Develop 1 % flood hazard levels 16 $2,960 <br />5. Document approach & Results 40 $7,400 <br />6. Coordinate with FEMA I Meetings 24 $4,440 <br /> Subtotal Task 1 $29,600 <br />Task 2: Permit Assistance <br />Allowance $20,400 <br /> Subtotal Task 2 $20,400 <br /> Total $50,000 <br /> <br />As we have discussed, we can complete tasks 1 through 4 above in about 3 weeks once we <br />start. We can start as soon as you authorize us. <br /> <br />P:\6786 Redwood Shores Levee AssessmentlAgm\GLe-2-03-09.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.