Laserfiche WebLink
<br />\ <br />":;-" <br /> <br />Grace Le, Redwood City <br />Redwood Shores Levee Proposal <br />r <br />Page 2 <br /> <br />~.kt <br /> <br />still water level, wave crest, and wave runup. Develop 95% confidence limits for the still <br />water level. <br /> <br />4. Develop flood hazard levels based on the peak still water level, wave crest, and wave <br />runup. <br /> <br />5. Document approach and results. <br /> <br />Task 2: Permit Assistance (Allowance) <br /> <br />This task is to provide assistance to the Huffman-Broadway Group (HBG) with procuring permits <br />for levee improvements. Specific tasks will include providing a project description for use in the <br />Army Corps, BCDC and Water Board permit applications, providing permit graphics and <br />quantities of excavation and fill, and coordinating with agencies as requested by the City and <br />HBG. <br /> <br />Since it is difficult to estimate a level of effort associated with procuring permits, we are <br />recommending an allowance be set aside for this task. The labor and materials expended for this <br />Task will be clearly detailed in our invoices, and all effort will be limited to permitting tasks only. <br /> <br />FEE & SCHEDULE <br /> <br />An estimate of hours by task is shown below. We will invoice monthly based on Time and <br />Materials. <br /> <br />Task Labor Fee <br /> ($185/hr) <br />Task 1: Supplemental Coastal Engineering Analysis <br />1. Wave transformation analyses 24 $4,440 <br />2. Empirical Simulation Technique analysis (EST) 40 $7,400 <br />3. Generalized Extreme Value Analysis 16 $2,960 <br />4. Develop 1 % flood hazard levels 16 $2,960 <br />5. Document approach & Results 40 $7,400 <br />6. Coordinate with FEMA I Meetings 24 $4,440 <br /> Subtotal Task 1 $29,600 <br />Task 2: Permit Assistance <br />Allowance $20,400 <br /> Subtotal Task 2 $20,400 <br /> Total $50,000 <br /> <br />As we have discussed, we can complete tasks 1 through 4 above in about 3 weeks once we <br />start. We can start as soon as you authorize us. <br /> <br />P:\6786 Redwood Shores Levee AssessmentlAgm\GLe-2-03-09.doc <br />