Laserfiche WebLink
<br />3.05 PRESERVATION OF PROPERTY <br /> <br />A. Immediately proceeding the seal application, the Contractor shall cover all <br />grates, slotted manholes, and other appurtenances on and adjacent to the <br />pavement that would allow the entry of the sealing materials; mask with roofing <br />paper, all closed manhole covers, water and gas valve box covers, monuments, <br />monument boxes, etc.; and remove all existing raised pavement markers, paint <br />and thermoplastic pavement markings. <br /> <br />B. Drainage inlets, shall be uncovered and cleaned to the satisfaction of the <br />Engineer as soon as the seal sets. The other surface utilities shall be <br />uncovered and cleaned the following day after completion of the slurry seal at <br />each location. If they are not uncovered within this time frame, no additional <br />seal shall be placed until they are uncovered. <br /> <br />C. Gutters, curbs, sidewalks, driveways, shoulders and other structures adjacent to <br />the pavement to be slurry sealed shall be cleaned of excess seal to the <br />satisfaction of the Engineer. <br /> <br />D. Asphalt pavement, concrete curb, gutter, sidewalk, and other concrete surface <br />structures along existing City streets damaged by the Contractor's operations, <br />including but not limited to walkways, lawns and other landscaping, fences, <br />gates, driveways, walls and mail boxes shall be replaced in kind by the <br />Contractor. <br /> <br />E. Full compensation for protecting and repairing property as specified herein shall <br />be considered as included in the price paid for other items of work, and no <br />additional compensation will be allowed therefor. <br /> <br />* <br /> <br />* <br /> <br />* <br /> <br />SLURRY SEAL <br /> <br />02540-6 <br />