Laserfiche WebLink
<br />~. <br /> <br />.. <br /> <br />o <br /> <br />o <br /> <br />EXHIBIT "A" <br />CITY-COUNTY HIGHWAY PROGRAM OF 1981 <br />Project Descriptions and Cost <br /> <br />1. Holly Interchange Project, Phase II <br />Estimated Cost: $2,180,000.00 <br />This project proposes installation of a southbound off-loop <br />to Redwood Shores Parkway, completing the full cloverleaf <br />interchange along with widening of the bridge deck from <br />two lanes to six lanes. <br /> <br />2. Charter and El Camino Real Traffic Signal System Project <br />Estimated Cost: $274,000.00 <br />It is proposed that a new traffic signal system be installed <br />and a raised concrete island extended to one existing north <br />of Hemlock. This island will inhibit left turns in and <br />out of Hemlock, reducing the conflict points currently <br />existing. <br />3. Middlefield Road and Marshall Street Traffic Signal Project <br />Estimated Cost: $90,000.00 <br />It is proposed that a new traffic signal system be installed <br />at the intersection of Middlefield Road and Marshall Street <br />to alleviate the significant angle-accidents now occurring <br />at this location. This isa primary entrance into the <br />County Government Center and is currently unsignalized. <br />