Laserfiche WebLink
6.J. - Page 77 of 86 <br />MWE <br />Page 2 of 4 / AC REPLACEMENT - L20 -0215b <br />Attachment C <br />• Duct transitions from existing ductwork to new unit on supply and return <br />• Duct flex connection on both supply and return of new units <br />• Sheet metal flashing around base of unit and roofing <br />• Structural Engineering for attachment only <br />■ Roofing Subcontractor to roof -over new equipment curbs <br />• Pre and post Replacement Air Flow Reading <br />• Straight time labor <br />• Project Management and Supervision <br />• Factory Startup of equipment <br />• Project closeout documentation (Warranty documentation, submittals, IOM's and startup <br />paperwork) <br />Based On: <br />• Free and clear access to work area, restroom, break area and building ingress/egress during all <br />phases of work <br />• 120 Volt Power within 10' of unit <br />• Controls integration by others, no reconnection of existing building controls <br />• Permission to swing crane in 2 mobilizations with and without load over building <br />• Existing condensate drain size, routing and drain location suitable for reuse without modification <br />• Existing duct mounted smoke detectors suitable for reuse <br />• Demolition to occur the day prior to rigging for removal <br />Excludes: <br />• Bonds, permits or special inspections of any kind, except as specifically included <br />■ Mechanical or Electrical Engineering <br />• Air Balance or duct pressure/leak testing <br />• Delays caused by others <br />• Temporary Heating/Cooling <br />• Title 24 Testing and certification <br />■ Site specific regulatory compliance <br />• Hidden or unforeseen site conditions <br />• Maintenance and repair of equipment <br />• ADA Compliance, modification or changes of any kind <br />■ Any other item, task, labor or materials not specifically included <br />Additional Clarifications: <br />■ Customer to provide as -built drawings of mechanical, plumbing, electrical, structural and <br />architectural for engineering <br />• Proposal based upon straight time labor. Equipment downtime estimated, but not guaranteed <br />to be 5 consecutive business days. Temporary heating/cooling not included. <br />495 <br />