Laserfiche WebLink
<br /> <br /> <br />cal. <br /> <br />Electrification Project Cb_ <br /> <br />Supports Caltrain's future operational growth <br />· System will have sufficient power capacity for longer consists on <br />5-minute headway operations - a primary goal of Caltrain 2025 <br />Compatible with regional interfaces <br />· Will enable projects such as Transbay Terminal to be served by <br />rail <br />· Sufficient clearances for freights and other diesels to operate <br />normally under the wires <br />Supports statewide initiatives <br />· Overhead wires will be designed to allow 90 mph operations, with <br />ability to adjust for 125 mph (California High Speed Rail) <br /> <br /> <br /> <br />