Laserfiche WebLink
<br /> <br />Landscape Irrigation Report <br /> <br /> <br />Additional Recommendations: <br /> <br />, Homeowners Association <br />Landscape Irrigation System Report <br /> <br />Tree Bubblers Flow varies and condition of pipe is questionable in areas. <br />Cap heads at established trees or in lawn areas or do not <br />program. (i.e. Station 19) <br /> <br />July 21, 2008 <br /> <br />Annual areas 2 stations have flowers and shrubs together. Both <br />stations need to be driven to the annual colors water <br />requirements. <br /> <br />Controller B was observed and audited for this report. Controller B is a 24 <br />station RainMaster Sentar controller and has 21 wires out of 24 spaces in <br />the controller. The site has a total of 4 controllers. For the purposes of this <br />report it can be assumed that the other controllers would have similar <br />results unless recent system checks and subsequent repairs / adjustments <br />have been made to any or all of the remaining controllers. <br /> <br />Birch Trees Birch trees are riparian trees. They prefer ampler water <br />at all times. Consider not planting Birch in shrub areas or <br />ensure bubblers are working to deliver extra water to <br />these trees. Cap bubblers in lawn areas or at trees that <br />do not need additional water. <br /> <br />. Recommendations <br />. Site and Irrigation System Information <br />. System Check and Photos (Station by station at end of report) <br />. Conservation Goals <br />. Irrigation Schedules and Flow Data <br />. Landscape Water Management Essentials <br /> <br />Blocked heads Make sure spray patterns are not blocked by bushes. <br />water fowl fencing, homeowners placed containers (228 <br />Monaco), other decorative features in front yards or close <br />down nozzle where they are blocked. <br /> <br />Key Recommendations: <br /> <br />Spray heads As spray heads need to be replaced they should be <br />placed 2 to 4 inches away from concrete edges to reduce <br />potential damage by edging equipment. The height <br />should be set to avoid damage by foot traffic or wheels of <br />maintenance equipment. <br /> <br />1. Repair or replace the leaking or non-operational equipment. <br />2. Align and straighten spray and rotor heads as needed. <br />3. Repair lateral line breaks <br />4. Scheduling - Cycle and soak turf areas with 3 start times with a <br />maximum of 4 days of operation. Water the shrub areas over <br />no more than 2 days and water deeply. Avoid shallow watering <br />through entire irrigation season by proper programming. If <br />using the percent key atleastlwo schedules should be <br />implemented to make % adjustments off of to reduce shallow <br />watering. (i.e. a spring/fall and a summer schedule) <br /> <br />Rotors Do not mix stream spray rotors with single stream rotors. <br />Select nozzles to balance distribution uniformity through <br />area. <br /> <br />High pressure Adjust the flow controls on the valves to reduce misting as <br />much as possible throughout site as needed. Misting is <br />easily moved off target by even minor winds. <br />