|
<br />88
<br />Page 46
<br />
<br />Table 8 - Payload Assumptions & Cost Comparison
<br />
<br />I SOUTH BAY RECYCLING
<br /> Solid Plant Food
<br />Hauling Assumptions Waste Inerts C&D Materials Scraps Totals
<br />Annual Estimated TonnaQe 303,663 7,354 22,023 71,588 11 ,868 416,496
<br />Averaoe Pavload (tonslhaul) 24.75 21.75 21.75 23.75 21.75
<br />Annual Number of Hauls 12,786 339 1,013 3,015 546 17,699
<br />Cost oer Haul $282 $277 $284 $315 $311
<br />Annual HaulinQ Cost $3,609,576 $93,997 $287,802 $948,704 $170,061 (15..11 0, 14.~
<br /> HUDSON BAYLOR CORPORATION
<br /> Solid Plant Food
<br />Hauling Assumptions Waste Inerts CaD Materials Scraps Totals
<br />Annual Estimated Tonnaae 303,663 7,354 22,023 71 ,588 11,868 416,496
<br />Averaae Pavlo,ad (tons/haul) 23.5 20.0 20 22.5 22.S
<br />Annual Number of Hauls 12,922 368 1,102 3,182 528 18,102
<br />Cost oer Haul $324 $323 $323 $324 $324
<br />Annual Hauling Cost $4,192,037 $119,035 $356.455 $1,031,416 $171,142 5 :870 ~ 085
<br /> .... . ',.
<br />HBC to SBR Difference $582,461 $25,038 $68,653 $82,712 $1,091 '..~~59t944 . ..
<br /> ALLIED WASTE INDUSTRIES
<br /> Solid Waste Plant Food
<br />Hauling Assumptions Inerts CaD Materials Scraps Totals
<br />Annual Estimated Tonnaoe 303,663 7,354 22,023 71.588 11,868 416,496
<br />Averaae Payload (tons/haul) 20.5 19.7 14.9 17.8 16.4
<br />Annual Number of Hauls 14,813 374 1 ,4 79 4,000 724 21 ,390
<br />Cost oar Haul $317 $316 $316 $317 $317 $317
<br />i Annual Haulino Cost $4,691,049 $118,220 $468,082 $1,266,542 $229,175 '$6,773.06'1~ .
<br />Annual Estimated Tonnage 303,663 7,354 22,023 71,588 11,868 416.496
<br /> I I . '.' '. ",. . ",
<br />HBC to Allied Difference $499,012 ($815) $111,626 $235,126 $58,033 · "$902,982 .......
<br />SBR to Allied Difference $1,081,473 $24,222 $180,280 $317,838 $59,114 $1;~62,927
<br />
<br />SBWMA - EC Report
<br />
<br />Page
<br />22
<br />
<br />1/15/2009
<br />
|