My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-01-06
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-01-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 4:12:47 PM
Creation date
1/2/2003 3:23:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
1/6/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
71 F-1 <br />REPORT <br />To the Honorable Mayor and City Council <br />From the City Manag <br />January 6, 2003 <br />Subject <br />Award of Contract — 2002 -2003 Sewer Main Replacement Project <br />Engineering File No. 806 -08 <br />Recommendation <br />Approve the Contract Documents and award the contract for the 2002 -2003 Sewer <br />Main Replacement Project to the lowest responsible bidder, Gelco Services, Inc. of <br />Salem, Oregon, for their low bid of $558,861.55, and reject all other bids. <br />Background <br />Every year the City undertakes a sewer replacement program funded by the Capital <br />Improvement Program Sewer Fund. This program is designed for systematically <br />replacing sewer collection system main lines, which have a history of service <br />disruptions due to age, excessive maintenance requirements, and /or capacity <br />limitations. A priority list is reviewed and updated annually by the Community <br />Development Services Department - Engineering & Construction, to determine the <br />priority areas to be included in the program each year. This year's program includes <br />the replacement of 13,000 linear feet of sewer main in various locations. <br />Two (2) bids were received at the bid opening on December 18, 2002, and are <br />summarized below. <br />Amount <br />Rank Contractor (Base Bid <br />1. Gelco Services, Inc. — Salem, Oregon $558,861.55 <br />2. West Valley Construction Company, Inc. — San Jose, CA $871,081.00 <br />Following is an explanation for the difference between the two bids. <br />The 2002 -2003 Sewer Main Replacement Project consists of two phases. <br />o- Phase one of the project is the lining of the existing six (6) inch and eight (8) inch <br />sanitary sewer mains by the Trenchless Technology method, and <br />Phase two is to replace existing sanitary sewer services by the conventional <br />open trench method. <br />
The URL can be used to link to this page
Your browser does not support the video tag.