My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 San Mateo, County of (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 San Mateo, County of (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2009 11:01:12 AM
Creation date
5/4/2009 10:52:41 AM
Metadata
Fields
Template:
Agreement
Contractor Name
San Mateo, County of
PROJECT NAME
MOU Corridor Project
RMP File Number
304
Reso Ref
14910
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Attachment A <br /> <br />Revisions in the MOD si2:ned bv the City of Burlin2ame: <br /> <br />Under General Objectives of the Smart Corridors <br />It is hereby agreed that the goal of the Smart Corridors Project \"rillis to provide participants to <br />this Iv10U with the following items: <br /> <br />Under General Roles and Responsibilities <br />The Parties commit to work together to tffipteHrerrtdevelop traffic management strategies and <br />alternate routes to mitigate non-recurring traffic congestion on local streets and state highways, <br />utilizing the pre-determined negotiated routes. <br /> <br />. Provide technical i::eBe'J7"oosassistance and guidance from local agency perspective in <br />revievving to help design and achieve a Smart Corridor that includes their jurisdiction. <br /> <br />. During major traffic incidents, to allow control of the Smart Corridors by the Traffic <br />Management Center, which "V\rill be established later. <br /> <br />Revisions in the MOD sif!ned bv Caltrans District 4: <br /> <br />In the first section of the M OU: <br /> <br />It is the intent that the operations and maintenance of the Smart Corridor's unique equipment <br />will be fully funded by C/C/'~G and other pa.rtics (}\i1TC and Caltruns) 'vyithother arrangelnents at <br />no cost to the participating cities and County. <br /> <br />Under Applicability of the Alternative Route <br /> <br />The alternative routes will only be 8.-e#v-aree-utilized during a major traffic incident on US 101. <br /> <br />Under Vision and Goal of the Smart Corridors Project <br /> <br />The Parties also agree that the Smart Corridors project, in concept, will support the following <br />incident management strategies, as described en-in ITS strategic planning document. <br /> <br />. Enhance roadway network operations to ensure safe and reliable travel - Installing new <br />communication and control stnlcturcs infrastructure will enhance and expedite tfa-me <br />communication between jurisdictions, and facilitate the conveyance of reliable alternate <br />route information to the traveling public in the event of a major traffic incident on US <br />101. <br /> <br />. Enhance the ability to respond to emergencies and incidents to improve safety and <br />reduce impacts to the transportation system - The main focus of the Smart Corridors <br />project is to provide a focused alternate route on appropriate local streets and state <br />highways during major traffic incidents on US 101. Installation of new communication <br />and detection devices are-~anticipated to facilitate communication Befw-eefl <br />jurisdi ctions and fnciEtatea1110ng iurisdictions. also facilitating conveyance of reliable <br /> <br />555 County Center, 5th Floor, Redwood City, CA 94063 PHONE: 650.599.1420 FAX: 650.361.8227 <br />www.ccag.ca.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.