Laserfiche WebLink
<br />R"!' :p....O..'.R..T: <br />. . . '. . : .' . <br />. ",. ,.... '. " <br />. . .... I ," ': <br /> <br /> <br /> <br />May 18, 2009 <br /> <br />SUBJECT <br />Final Acceptance - Veterans Boulevard Storm Drain Pump Station Electrical Upgrade <br />Project <br /> <br />RECOMMENDATION <br />Accept, by motion, the Veterans Boulevard Storm Drain Pump Station Electrical Upgrade <br />Project and authorize the release of bonds and the retention according to city procedures. <br /> <br />BACKGROUND <br />On July 21, 2008, Council awarded the construction contract for the Veterans Boulevard <br />Storm Drain Pump Station Electrical Upgrade Project to Pleasanton Engineering <br />Contractors, Inc. The project was awarded for a base bid of $349,563.00. Construction <br />began in October, 2008. The project is successfully completed in accordance with the <br />plans and specifications. One (1) change order crediting $96,076.00 to the city was <br />issued. The final contract amount is $253,487.00 which is 37.9% less than the contract <br />amount initially awarded. <br /> <br />Change order activity resutted largely from the deletion of a generator and the addition of a <br />motor control center to the scope of work. It was determined that the acquisition of the <br />generator would be more appropriate at a future time. The deletion of this item generated <br />a credit of $102,567.00. The motor control center which was originally believed to be <br />salvageable, had to be replaced. The minimal cost for this additional item, $6,491.00, <br />resulted from value engineering efforts. <br /> <br />The work of this project included construction of a concrete masonry unit building and the <br />replacement, relocation, and reconnection of electrical and other equipment necessary to <br />the operation of a pump station. This project improved the reliability and the safety of the <br />facility . <br /> <br />ALTERNAnVES <br />Council may choose not to accept the project or not to authorize the release of bonds and <br />retention which would be contrary to the terms of the contract, prior Council action, and <br />public contracting code. <br /> <br />FISCAL IMPACT <br />Funding for this construction agreement has been previously approved by Council and <br />appropriated from Fiscal Year 2007-2008 Capital Projects Fund, Veterans Avenue Pump <br />Station Rehabilitation and funds from Storm Drai ollection System Construdion. <br /> <br />~~~~~4!~- ~ ~ <br />M. Saber Sarwary. P.E. . P ter Vorametsanti, P.E., Acting Manager <br />Acting Supervising Civil Engineer E glneerlng and Construction Division <br /> <br />~ -Ar V ~ <br /> <br />Peter Ingram ~ <br />City Manager <br /> <br /> <br />ATTACHMENTS <br />None <br />RELATED DOCUMENTS IN CITY CLERK'S OFFICE <br />None <br />