My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-05-18
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2009 9:30:58 AM
Creation date
5/14/2009 4:02:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council and Redevelopment Agency
Date
5/18/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. .. <br /> <br />H. License Agreement between the City of Redwood City and Fresh & Natural <br />Food Service Group for cafe at Redwood Shores Branch Library. <br /> <br />Staff contact: Dave Genesy, Library Director 780-7060 dgenesy@redwoodcity.org <br /> <br />Recommendation: <br />By motion, approve the License Agreement with Fresh & Natural Food Service <br />Group for cafe services at the Redwood Shores Branch Library. <br /> <br />6.2 FINAL ACCEPTANCES <br /> <br />A. Final Acceptance - Redwood Shores Slurry Seal Project. <br /> <br />Staff contact: M. Saber Sarwary, P.E., Acting Supervising Civil Engineer 780-7370 <br />ssarwary@redwoodcity.org <br /> <br />Recommendation: <br />Accept, by motion, the Redwood Shores Slurry Seal Project, and authorize the <br />release of bonds and retention according to city procedures. <br /> <br />B. Final Acceptance - Veterans Boulevard Storm Drain Pump Station Electrical <br />Upgrade Project. <br /> <br />Staff contact: M. Saber Sarwary, P.E., Senior Civil Engineer 780-7370 ssarwary@redwoodcity.org <br /> <br />Recommendation: <br />Accept, by motion, the Veterans Boulevard Storm Drain Pump Station Electrical <br />Upgrade Project and authorize the release of bonds and retention according to <br />City procedures. <br /> <br />C. Final Acceptance - Hoover Synthetic Turf Field Replacement Project. <br /> <br />Staff contact: Brian Lee, P.E., Acting Supervising Civil Engineer 780-1391 blee@redwoodcity.org <br /> <br />Recommendation: <br />Accept, by motion, the Hoover Synthetic Turf Field Replacement Project, and <br />authorize the release of bonds and retention according to City procedures. <br /> <br />D. Final Acceptance - Redwood City Recycled Water Project - Phase I - Seaport <br />Distribution System - Bid Package 7 (Bike Path, East Bayshore Road, Maple <br />Street, Bloomquist Street, and Seaport Boulevard) Project. <br /> <br />Staff contact: Phong Du, P.E., Senior Civil Engineer 780-7385 pdu@redwoodcity.org <br /> <br />SPECIAL CITY COUNCIUREDEVELOPMENT AGENCY BOARD <br />MEETING AGENDA <br /> <br />MAY 18, 2009 <br />PAGE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.