Laserfiche WebLink
<br />6.1E <br />EXHIBIT ~? <br /> <br />April 3, 2009 <br /> <br />File No. 55A0285B <br /> <br />Mr. Peter Vorametsanti <br />Engineering & Construction <br />City of Redwood City <br />1017 Middlefield Road <br />Redwood City, CA 94063 <br /> <br />RE: ROllte 101/ Ralstoll Avenue Rigllt of Way Project <br />PROPOSAL FOR EXTRA WORK i.' <br /> <br />Dear Mr.Vorametsanti: <br /> <br />We are pleased to submit this proposal for additional design services for the Route <br />lOI/Ralston Avenue Interchange Right of Way Project. These additional services have come <br />about due to extensive close-out effort required to complete the right of way transaction <br />process for the interchange project. <br /> <br />SCOPE OF EXTRA WORK <br /> <br />Task 1- Right of Way Closeout <br /> <br />· Project Management and Meetings <br />· Assist the City of Redwood City (City) with the right of way closeout process <br />and transfer of right of way from City to Caltt'ans (Overall project record map <br />and notes) <br />. legals and plats for bike path easement <br />. Assist with Caltrans coordination and approval of documents <br />· Record of Survey (A Record of Survey will be filed with the County of San <br />Mateo upon the completion of this project. The Record of SUlvey will show <br />the State right of way. A % inch iron pipe with a Surveyor~s tag will be placed <br />at the four major angle points along the new right of way. This scopes <br />assumes that sufficient control still exists on the site.) <br /> <br />Task 2 - Title Report for quitclaim deed (OPTIONAL TASK) <br /> <br />· Prepare right of way closeout documents <br />.. Title Report (parcel 58621Al) for quitclaim deed if required by <br />Caltrans <br />