My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-06-22 clsd and jnt
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-06-22 clsd and jnt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:22:20 PM
Creation date
6/18/2009 4:10:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
6/22/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1 D <br /> Page 1 <br /> i�.�:P�O����R�T <br /> To ���e H��o�tp�ra��e A�l��o.r a�:��d C��� ����+�:i:� <br /> F�r�nrt ��� ��`�.:�� Il�an�� e.�r <br /> June 22, 24�9 <br /> SUBJECT <br /> Professional service agreement with V&A Consulting Engineers, Inc. in #he amount af <br /> $139,400.04 for corrosion engineering services for the Seaport Boulevard - Water <br /> Transmission Pipelines Ca#hodic Protection Project <br /> REC4AAMENDATION <br /> Approve, by motion, the professional serv�ces agreement with V&A Consulting <br /> Engineers, lnc. to provide pipeline evaluation and cathodic protect�on system design for <br /> Seapart Boulevard water main #ransmission pipe[ines in an amount not #o exceed <br /> $139,400.00 and author�ze the City Manager to increase the contract amount up to 10% <br /> if necessary. <br /> BACKGROUND <br /> In 2Q44, V&A submitted a proposa! to develop a master plan to control corrosion of the <br /> City's water piping system. Bas�d on their experience and qualifications, V&A was <br /> retained to develop the master plan. The plan includes a prioritized lis# of projects <br /> intended #o arrest naturally occurE-ing corrosion of the City's water transmission piping to <br /> extend �te useful life of the system. <br /> The Cathodic Prote�tian Project for Topaz and Redwood Shores Water Transmission <br /> Pipeiines was the first project recommended for comp�etion by #he master plan. V&A <br /> designed the project, the construction contract was awarded to Cvrrpro, and the projec# <br /> was successfully comple#ed in 2006. <br /> Cathodic protection for the water transmission pipelines along Seaport Bouie�ard is the <br /> second project recommended for completion by the master plan. The purpose of this <br /> project is to evaluate and improve the cathodic protection systems of finro Seaport <br /> Boulevard pipelines -- an 8-inch s#eel water distribution pipe ins#alled in 1937 and a 16- <br /> inch steel water transmissian pipe installed in 1978. Each pipeline is approximately <br /> 9,��0 fee# in length. <br /> The evaluation and design work of this project is proposed as follows. <br /> Phase I —"Assessment� <br /> Installation of ten new test stations, test, and anaiyze. <br /> Phase I! —"Design of Cathodic Protection System" <br /> Preparation of construction plans, estimates and specifications. <br /> Staff recommends V&A for the proposed assessment and design phases of the Seaport <br /> Boulevard � VIlater Transm�ssian Pipelines Cathodic Pratection Project due to their <br /> experience and past per�ormance on other similar City projec#s. <br />
The URL can be used to link to this page
Your browser does not support the video tag.