My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-07-13 clsd and jnt
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-07-13 clsd and jnt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2009 3:45:46 PM
Creation date
7/9/2009 3:08:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
7/13/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1D <br />Page 31 <br /> <br />.. ).;~ ..~. City of Redwood City <br />;~~.\.~ .' .... ii= <br /> <br />from the applicant, the City of Redwood City's General Plan and Zoning Ordinance, <br />and other reports and studies commissioned by the applicant or the City that may <br />have relevance to the proposed project. The purpose of the review will be to <br />develop .2 complete and thorough understandirig of the proposed project, the <br />potential impacts ,of the individual and collective project 'elements, and the existing <br />data sets available for use during preparation of the EIR. <br /> <br />:MHA,IRMT will also conduct a site reconnaissance of the project site and project <br />area as a part of 'Element 1.1. <br /> <br />Element 1.2. Define the Project and Prepar~ the Proj.ect Description: MHA I RMT <br />will, based on review of pertinent documents and discussions with -City staff, define <br />the project within the context of CEQA for use in the IS, Notice or Preparation <br />(NOP), and EIR. The project description will, ata miniInum, .include the <br />identification of the purpose and need for the proposed project, detailed <br />descriptions and maps (as appropriate) of each of the project elements, and a list of <br />permits required to implement the project (including permits r~quired from other <br />agencies). The proje.:t description will be submitted to City staff in draft form for <br />review and comment, followed by 'refinement as warranted.. <br /> <br />Element 1.3. Prepare Administrative Draft Initial Study: MHA t RMT will prepare <br />an Administrative Draft IS based on the CEQA O\ecklist (Appendix G of the CEQA <br />Guidelines). The purpose of the Administrative Draft IS, and the IS (Element 1.4), <br />will be to refine and focus the environmental parameters to be addressed in the ElR <br />to those that may have significant effects from implementation of th~proposed <br />project. In so doing, the scope of the EIR may be focused only on those specific <br />environmental parameters likely to be affected by the proposed project The <br />Administrative Draft IS win be submitted to City staff for review and comment. <br /> <br />Element 1.4.. 'Prepare Initial Study and Notice of Preparation:MHA I RMT will <br />prepare an IS based on the City's comments on the Administrative Draft IS (Element <br />1.3). MHA I RMT will prepare a Notice of Preparation (NOP) for distribution by <br />M:HA I RMT, with an address list to be supplied by the Oty. The Notice will be <br />prepared in accordance with CEQA. Distribution of the Notice is anticipated to <br />occur at least three weeks prior to the Scoping Meeting (Element 1.5). <br /> <br />Element 1.5. Prepare for ~nd Conduct a ScopingMeetiilg: MHAI RMT will, in <br />consultation with City staff, prepare for and assist the Oty in leading a seoping <br />meeting during a regularly scheduled meeting of the Planning Commission, Oty <br />CounciL or other forum according to the City's established protocol. The purpose of <br />the seoping meeting will be to inform the community about the proposed project, to <br />identify the environmental review process required by CEQA, to outline the <br />preliminary list of issues to be considered through the process (as identified in the <br />IS), and to solicit comments on the scope of the 'EIR's analyses. In addition to <br /> <br />January 11,2008 <br />RMT . <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.