Laserfiche WebLink
<br />6.1F <br />Page 9 <br /> <br />EXHIBIT "B" <br /> <br />To Agreement for Program Management SeNices between City of Redwood City and <br />Whitley Burchett & Associates <br /> <br />Schedule of Fees <br />City of Redwood City <br />(Effective July 1, 2009) <br /> <br />Services described herein shall be provided on a time-and-materials basis unless other <br />methods of compensation are identified for specific task authorizations. The following <br />rates shall be in effect through December 31,2009, at which time they will be subject to <br />change. <br /> <br />Labor Cateaorv: <br />Executive Engineer <br />Managing Engineer <br />Emeritus Engineer <br />Supervising Engineer <br />Principal Engineer <br />Senior Engineer <br />Engineer/Project Manager <br />Associate Engineer <br />Senior Construction Inspector <br />Assistant Engineer <br />Construction Inspector <br />Senior CADD Operator <br />CADD Operator <br />Clerical <br /> <br />Normal Rate <br />$/Hour <br /> <br />$221.00 <br />$208.00 <br />$ 200.00 <br />$198.00 <br />$187.00 <br />$176.00 <br />$152.00 <br />$137.00 <br />$126.00 <br />$116.00 <br />$100.00 <br />$100.00 <br />$ 89.00 <br />$ 89.00 <br /> <br />Other Direct Costs: <br /> <br />Direct costs, such as transportation within the Bay Area, normal reproduction, computer <br /> <br />7 <br />