Laserfiche WebLink
<br />Recommendation: <br />Approve, by motion, the contract documents and award the contract for the Sewer <br />Force Main Replacement Project (from Pump Station No. 12 to Pump Station No. <br />10) to the lowest responsible bidder, Peak Engineering, Inc. of Oakland for their <br />responsive and responsible low bid of $414,635.11 and authorize the City <br />Manager to increase the contract amount up to 100/0 if necessary. <br /> <br />I. Award of Contract - 2008-2009 Asphalt Rubber Chip Seal Project. <br /> <br />Staff contact: M. Saber Sarwary, P.E., Acting Supervising Civil Engineer 780-7370 <br />ssarwary@redwoodcity.org <br /> <br />Recommendation: <br />Approve, by motion, the contract documents and award the contract for the 2008- <br />2009 Asphalt Rubber Chip Seal Project to the lowest responsible bidder, <br />International Surfacing Systems of Modesto, for their low bid of $752,940.44 and <br />authorize the City Manager to increase the contract amount, if necessary, up to <br />100/0 of the amount awarded. <br /> <br />6.2 Section - Final Acceptances <br /> <br />A. Final Acceptance - Lower Stulsaft Park Prefabricated Restroom Building <br />Replacement Project. <br /> <br />Staff contact: Brian Lee, P.E., Supervising Civil Engineer 780-1391 blee@redwoodcity.org <br /> <br />Recommendation: <br />Accept, by motion, the Lower Stulsaft Park Prefabricated Restroom Building <br />Replacement Project and authorize the release of bonds and retention according <br />to city procedures. <br /> <br />B. Final Acceptance - Hoover Park Prefabricated Rest Restroom Building <br />Replacement Project. <br /> <br />Staff contact: Brian Lee, P.E., Supervising Civil Engineer 780-1391 blee@redwoodcity.org <br /> <br />Recommendation: <br />Accept, by motion, the Hoover Park Prefabricated Restroom Building Replacement <br />Project and authorize the release of bonds and retention according to city <br />procedures. <br /> <br />C. Final Acceptance - Energy Lighting Retrofit Project. <br /> <br />Staff contact: S. Peter Vorametsanti, P.E., Acting Manager, Engineering and Construction 780-7388 <br />peterv@redwoodcity.org <br /> <br />JOINT CITY COUNCILREDEVELOPMENT AGENCY BOARD <br />MEETING AGENDA <br /> <br />JULY 13,2009 <br />PAGE 4 <br />