My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-07-13 clsd and jnt
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-07-13 clsd and jnt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2009 3:45:46 PM
Creation date
7/9/2009 3:08:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
7/13/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1C <br />Page 37 <br /> <br />Mr. John Wagstaff <br />May 18, 2009 <br />Page 2 of 3 <br /> <br />2006 DPP EIR and the recent counts. This comparison showed several turning <br />movements with substantial changes between 2005 and 2007-2008 - with some <br />movements increasing and decreasing by as much as 50%. Thus, it cannot be <br />conclusively shown that traffic conditions have not changed since the 2006 DPP EIR <br />was prepared. However, data collection efforts are costly and may result in time <br />delays for completion of the study if traffic counts cannot be collected before SCl1001 is <br />out for the summer on June 18, 2009. <br /> <br />3. Forecasting methods should be consistent with the General Plan and Mjd~Point <br />Technology Center EIR. The forecasting methods currently being applied for the <br />General Plan Update and Mid-Point Technology Center are different from those used <br />in the 2006 DPP EIR. The two current EIR are using the Redwood City's travel <br />demand forecasting model, while the 2006 DPP EIR used a manual assignment of <br />pending project traffic volumes plus an annual growth rate. These two methodologies <br />could result in substantial differences between future year forecasts. If the resulting <br />forecasts are substantially different and the number of study locations is reduced <br />(see assumption 1 above). it is possible that there may be impacts at Intersections <br />that were dropped from the analysis. <br /> <br />The fixed-fee cost to conduct the TIA as described in the scope of work is $69,700, which does <br />not include new traffic counts or field observations. This fee estimate includes all professional and <br />support staff time, as well as direct expenses, and will be billed on a monthly basis. Attendance at <br />two project-level meetings and two public hearings is also included in this proposal. If there are <br />requests for services outside the attached scope of work, we will make a written budget request <br />prior to beginning work. Additional services will be conducted upon written authorization and <br />billed on a time-and-materials basis according to the attached rate schedule (Attachment 8). Our <br />standard terms (Attachment C) apply to this proposal; the terms are valid for a period of 30 days. <br /> <br />We estimate that we can complete the proposed scope of work and submit a draft report for your <br />review within sixteen weeks of receipt of a signed contract and traffic counts and all relevant <br />background information. Please sign below to indicate authorization to proceed. <br /> <br />To prepare a comprehensive (analysis of all 42 locations), free-standing report With updated <br />existing conditions, we estimate the fee would be $110,000 plus $18,480 for new vehicle, bicycle, <br />and pedestrian counts at 28 intersections. We estimate that these additional tasks would add four <br />(4) weeks to the schedule, for a total of 20 weeks. <br /> <br />Should you have any questions or need any additional information, please do not hesitate to call <br />us. We look forward to working with you on this project. <br /> <br />Sincerely, <br /> <br />FEHR & PEERS <br />Jason Nesdahl. CE70682 <br />Is licensed by the Board for Professional <br />Engineers and land Surveyors <br /> <br />ACCEPTED BY: <br /> <br />Wagstaff & Associates <br />Signature: <br /> <br />/"; - it /; <br />///} ,1' ~ <br />~. i,// J 'I,"" ..t., , <br />/ ,- .,' .'\,': l.-.. <br /> <br /> <br />for Jason Nesdahl, P.E. <br />Senior Transportation Engineer <br /> <br />Printed Name:__, <br /> <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.