Laserfiche WebLink
PROJECT SCHEDULE <br />The consultant shall begin the work upon receipt of a Notice to Proceed from the City <br />Engineer or designee. <br />The Consultant's detailed presentation of their project schedule is shown below: <br />Task <br />Number <br />Task and Major Milestones <br />Goal <br />Approve Contract for Engineering Services (NTP) <br />12/4/2020 <br />1 <br />Data Collection and Alternative Evaluations <br />1b <br />Site Review, Survey, and Observations <br />12/21/2020 <br />2 <br />Evaluate Proposed Projects and Probable Construction <br />Cost <br />2a <br />Inspection and Observation Evaluation <br />12/22/2020 <br />2b <br />Proposed Project Identification <br />1/5/2021 <br />2c <br />Engineer's Opinion of Probable Construction Cost <br />1/15/2021 <br />3 <br />Project Prioritization, Assessment Calculations, and Report <br />3a <br />Project Prioritization <br />1/15/2021 <br />Draft Conditions Report <br />1/15/2021 <br />3b <br />Assessment Calculations <br />2/11/2021 <br />3c <br />Conditions Report - Final <br />2/12/2021 <br />4 <br />Repair and Replacement Plan, Exhibits, Schematic and <br />Conceptual Drawings <br />3/12/2021 <br />REV: 12-23-2020 PR <br />ATTY/AGR.2020.312/BKF Engineers (CFD No. 2020-1 Seaport Centre/Seaport Plaza) (Page 17 of 17) <br />