Laserfiche WebLink
<br />EXHIBIT A <br /> <br />2010-2011 TPSRP PRICES <br /> <br />Item EST. SPENCON SPENCON Unit Price + Item Cost <br /> 1.33% <br />No. Qty. Unit Description of Item Unit Price Item Cost <br /> (2009 Bid Price) <br />1 28,500 SF Remove existinQ sidewalk $1.00 $28,500.00 $1.01 $28,879.05 <br />2 27,500 SF Construct concrete sidewalk $6.76 $185,900.00 $6.85 $188,372.47 <br /> Remove existing sidewalk for $1.00 $1,000.00 $1.01 $1,013.30 <br />3 1,000 SF installation of rubber sidewalk <br />4 6,000 SF Remove existing driveway $1.00 $6,000.00 $1.01 $6,079.80 <br />5 6,000 SF Construct concrete driveway $7.60 $45,600.00 $7.70 $46,206.48 <br />6 5,600 LF Remove existing curb and $3.00 $16,800.00 $3.04 $17,023.44 <br /> gutter <br />7 5,600 LF Construct concrete curb and $25.00 $140,000.00 $25.33 $141,862.00 <br /> gutter <br />8 500 SF Remove walkway material $1.00 $500.00 $1.01 $506.65 <br />9 EA Construct wheel chair ramp <br /> 38 (Std. Detail C-9 Case C) $1,080.00 $41,040.00 $1,094.36 $41,585.83 <br />10 5,000 SF Remove and replace asphalt $5.00 $25,000.00 $5.07 $25,332.50 <br />11 100 LF Repair irrigation system $5.00 $500.00 $5.07 $506.65 <br />12 10 CY Additional sub-base excavation $40.00 $400.00 $40.53 $405.32 <br />13 20 LF Drain Line Installation $65.00 $1,300.00 $65.86 $1,317.29 <br /> Total base bid item 1 through 13 $492,540.00 $499,090.78 <br /> <br />Amendment NO.1 to 2010-2011 Tree Preservation and Sidewalk Replacement Program <br />