My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 SpenCon Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 SpenCon Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2011 8:18:26 AM
Creation date
7/20/2009 12:36:03 PM
Metadata
Fields
Template:
Agreement
Contractor Name
SpenCon
PROJECT NAME
2009-10 Tree and Sidewalk Repair Program
RMP File Number
304
Date
7/9/2009
MO Ref
MO 09-113, MO 10-098, 10-132, 11-059
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br /> 2011-2012 TPSRP PRICES <br /> Item EST. UnitPrice+ UnitPrlce+ <br /> SPENCON SPENCON 133 ItemCost 319 ItemCost <br /> No. Qty. Unit Descriptian of Item Unit Price � Prices for I Prices for <br /> (2009 Bid Price) �tem Cost Amend. 7 <br /> Amend. 2 <br /> � ze,50o SF Removeexistingsidewalk $1.00 $28,500.00 $1.01 I $28,879.05 $1.05 $29,80029 <br /> � <br /> p z7,5oo SF Construct concrete sidewalk $676 $185,900.00 $6.85 $188,372.47 <br /> $7.07 $194,381.55 <br /> Removeexistingsidewalkfor $�.00 $1,000.00 $1.01 $1,013.30 <br /> 3 t,000 SF installationofrubbersidewalk $1.05 $1,045:62 • <br /> � <br /> q s,000 SF Remove existing driveway '$1.00 $6,000.00 $1.07 $6,079.80 <br /> $1.05 $6,273.75 <br /> 5 s,000 SF Conslructconcretedriveway $7.60 $45,600.00 $770 $46,206.48 <br /> $7.95 $47,680.47 <br /> g s,coo LF Remove existing wrb and gutter . <br /> $3.00 $16,800.00 � $3.04 $17,023.44 <br /> I $3.14 $17,566.49 <br /> 7 s,eoo LF Constmct concrete curb and <br /> gutter 525.0� $140,000.00 $25.33 $141,862.00 I <br /> . $26.14 $146,387.40 <br /> . g 50o SF Remove walkway material $1.00 $500.00 $1.01 $SOfi.65 <br /> _ $1.05 $522.87 <br /> 9 EA Construct wheel chair ramp (Std. <br /> 47 Detail C-9 Case C) $1,080.00 $5q760.00 $1,094.36 $51,435.11 <br /> $1.12927 $53,075.89 <br /> 70 s.000 SF Remove and replace asphalt $ 5.00 $25,000.00 $5.07 $25,332.50 <br /> _ $523 $26,140.61 <br /> 7� foo LF Repairirrigationsystem $5.00 $500.00 $5.07 $506.65 <br /> $5.23 $522.81 <br /> � <br /> 12 io I CY Additional sub-base ezcavalion $40.00 $400.00 $40.53 $405.32 I $41.82 $41825 <br /> 13 � LF Drain Line Installation $65.00 $975.00 $65.86 $987.97 � <br /> $67.97 $1 ,019.48 <br /> Total 6ase bid item 1 through . <br /> 13 E501,935.00 5508,610.74 $524 ,835.42 <br /> � <br /> � <br /> 51Righ40t-Way\10_11 TPSRP\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.