My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-07-27 spc and jnt
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-07-27 spc and jnt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2009 3:57:31 PM
Creation date
7/23/2009 2:29:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/27/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />R.EP,ORT.. <br /> <br />6.18 <br />Page 1 <br /> <br />. To the Honorable MaYe'Jr and City COU~CU. <br />. . F.-om :th, Ci. : ."ana er <br /> <br />July 27, 2009 <br /> <br />SUBJECT <br />2009-2010 Cost Shared Sidewalk Repair Program <br /> <br />RECOMMENDATION <br />Approve by motion the contract documents, accept the bid, and award the contract for <br />the 2009-2010 Cost Shared Sidewalk Repair Program to SpenCon Construction lnc.~ of <br />Foster City, CA, for the amount of $241,025 and authorize the City Manager to increase <br />the contract amount, if necessary, up to 100/0 of the amount awarded, and reject all <br />.other bids. <br /> <br />. BACKGROUND <br />On June 9, 2009, staff advertised the subject contract and notified previous bidders the <br />contract documents and specifications were available for their review and purchase. <br />The proposed contract has been duly advertised and four sealed bids were received <br />and opened in City Hall on July 1,2009. <br /> <br />Bidder <br />S enCon Construction Inc. <br />Ba Area Pavin , Inc <br />JJR Construction Inc. <br />AI ine Construction, Inc. <br /> <br /> <br />Bid Amount <br />$241 ,025.00 <br />$261,650.00 <br />$269,526.04 <br />$310,000.00 <br /> <br /> <br />$218,000.00 <br /> <br />Recommended Bidder: SpenCon Construction Inc. <br /> <br />Substantiation: Lowest Responsible Bid <br /> <br />The lowest responsible bid is approximately ten percent above the Engineer's Estimate <br />for this project. SpenCon was the primary contractor for last year's 1000/0 sidewalk <br />replacement project and they again are the contractor for this year's 1000/0 sidewalk <br />repair project. The Cost Shared project will repair damaged sidewalk, driveway <br />approach and curb and gutter at any location in the City where the property owners <br />agree to pay one-half the cost of the repair. The work will be performed at va(ious sites <br />on different streets throughout the city. The project also includes construction of wheel <br />chair ramps and installation of tree grates per city details. <br /> <br />Staff maximizes preservation of retainable trees by the installation of poured-in-place <br />rubber surfacing which is done in order to avoid root cutting. The Urban Forestry <br />Specialist will inspect every tree site where there is conflict between the sidewalk and <br />tree roots to make a decision, in conjunction with the project inspector, about how to <br />proceed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.