My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Covello Group, The
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 Covello Group, The
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2014 3:07:37 PM
Creation date
7/28/2009 11:33:13 AM
Metadata
Fields
Template:
Agreement
Contractor Name
The Covello Group
PROJECT NAME
El Camino Real Sewer and Water Main Replacement Project
RMP File Number
304
Date
7/27/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment 2 <br /> Construction Management Services <br /> Redwood City <br /> El Camino Real Sewer and Water Main Replacement Project <br /> 7. Field Orders (FO) and Field Directives (FD) <br /> a. In the event that the Contractor encounters a time sensitive <br /> problem where it is not practical to take time to negotiate a <br /> settlement, the CM will issue a FO. All work done under a <br /> FO will be completed on a time and material basis. The <br /> CM and the City of Redwood City will execute the FO. <br /> b. Field Directives will be issued to the Contractor when the <br /> directed work is to proceed under protest. <br /> 8. Progress Payments <br /> a. Administrate the preparation and processing of the monthly <br /> progress payments. <br /> 9. Scheduling <br /> a. Review and work with the Contractor in their development <br /> of the initial baseline schedule and preparation of the <br /> weekly updates. <br /> b. Provide written comments to the Contractor on the <br /> baseline and weekly update schedules. <br /> II. Field Inspector(FI): Jonathan Cowsert <br /> A. Project Responsibilities <br /> 1. Field Observation (When on-site) <br /> a. Provide field observation services to monitor compliance <br /> with Contract Documents. <br /> b. Prepare a daily inspection report documenting all field <br /> activities, field crews, Contractor equipment, and field <br /> problems. <br /> c. Submit all daily inspection reports to the CM and the City. <br /> d. Coordinate with the CM to maintain the database, <br /> implemented by Covello, for daily observation reports and <br /> photographs. <br /> e. Provide photographic documentation of the project prior to <br /> construction, and maintain photographs of field activities <br /> for status monitoring of the project. <br /> III. Special Inspections, Testing <br /> A. Schedule and coordinate special inspections, materials testing. <br /> B. Covello will contract for all special services including: <br /> a. Hazardous materials inspections, testing or consultations. <br /> b. Concrete quality control and testing <br /> c. Soils testing <br /> d. Geotechnical services <br /> C. Redwood City will contract for all other design related services. <br /> III. Project Closeout <br /> A. The Contractor will furnish record documents, which Covello will turn over <br /> to Redwood City. <br /> C. Final Inspection and Punch List <br /> May 13,2009 Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.