My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 BKF Engineers (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 BKF Engineers (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2009 9:43:08 AM
Creation date
7/28/2009 12:11:52 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Redwood Shores Levee Improvement Project
RMP File Number
304
Date
7/21/2009
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I"'~ <br />II- <br />BkJ <br /> <br />APPROACH <br /> <br />EXHIBIT A - SCOPE OF WORK <br /> <br />Redwood Shores - Levee Improvements <br />San Carlos Airport Se2ment <br /> <br />PROJECT UNDERSTANDING <br /> <br />Our understanding of the levee improvements is based on a meeting with the City and <br />County on 5/21/09 and 6/4/09. The levee surrounding the San Carlos airport varies in <br />elevation from about 9.5 to 12.0. A section in the southern portion of the airport is within <br />the "safety area". This section of the levee will be designed with a temporary measure <br />such as an inflatable bladder. The other sections of the levee outside the "safety area" will <br />be increased to meet FEMA requirements, based on recommendations from Moffatt & <br />Nichol. Overall limits of levee improvements, addressed in this proposal, are shown on the <br />attached exhibit. <br /> <br />Weare assuming that only one location requires night work. We have assumed that the <br />only permit that will be obtained is a San Mateo County drilling permit and that all fees <br />will be waived. We have assumed that there are no utility conflicts and no need for a <br />private utility locator and that proper utility conflict location in the field will be the <br />responsibilitY of the utilitY owner. <br /> <br />SCOPE OF SERVICE <br /> <br />Task 1. Field Exploration <br /> <br />Geotechnical services as described in the attached proposal by ENGEO. <br /> <br />Exclusions <br /> <br />The following are excluded from BKF's scope of services: <br /> <br />The scope of this project is limited specifically to the work listed in Task 1 of this proposal. <br />Other work associated with the Airport Segment will be presented in a separate proposal. <br /> <br />City of Redwood City - Redwood Shores Levee Improvements - San Carlos Airport Segment <br />Date: June 30, 2009 <br /> <br />650.482. 6300 <br />www.bkf.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.