Laserfiche WebLink
<br />EXHIBIT A <br /> <br />A. From Jefferson Avenue to Madison Avenue <br /> <br />1. Construct concrete combined curb and gutter on each side <br />of street <br /> <br />2. New paving between existing pavement and new gutters on <br />each side of street. <br /> <br />3. Resurface existing pavement. <br /> <br />B. From Madison Avenue to Vera Avenue. <br /> <br />1. <br />i <br /> <br />Remove existing curbs and gutters and construct new curbs <br />and gutters on each side of street. <br /> <br />2. <br /> <br />New paving between existing pavement and new gutters on <br />each side of street <br /> <br />3. <br /> <br />Resurface existing pavement. <br /> <br />G. From Vera Avenue to Roosevelt Avenue. <br /> <br />1. Construct curbs and gutters on each side of street. <br /> <br />2. Construct pavement. <br /> <br />D. From Roosevelt Avenue to Redwood Avenue. <br /> <br />1. Remove existing curb and g~tter and construct new curb <br />and gutter northeasterly side of street only. <br /> <br />2. New paving between existing pavement and new gutter on <br />northeasterly side of street only. <br /> <br />3. Resurface existing pavement. <br /> <br />4. Construct new reinforced concrete culvert over creek <br />near Redwood Avenue <br /> <br />5. Portion of storm drain. <br /> <br />E. Redwood Avenue to northwesterly boundary of Woodside Acres <br />Map No.1. <br /> <br />1. Remove existing curbs and gutters and sidewalks and <br />construct new curbs and gutters and sidewalks on each side <br />of street. <br /> <br />2. New paving between existing pavement and new curbs. <br /> <br />3. Resurface existing pavement. <br />4. Portiqn of storm drain <br /> <br />4. <br />