Laserfiche WebLink
7A <br /> Page 23 <br /> sufficient wi#hout accounting f.or the Iong-term impacts of creek erosion and bank <br /> instability.GEC}IlVSITE further states tbat they have not reviewed da#a that would <br /> support constructing the homes any closer to the creek edge than currently allowed.by <br /> . ardinance.T'he Applica��'s experts,hvwever,still de�y the possibility of any problems ... <br /> associated with rhe cxeek bank. <br /> Discussion <br /> The new plan submittals and report do not change our eonclusi.ons on the condirion af the <br /> creek bank ox�he poten.tial for exposing the cre�k side properties to adverse effects due to <br /> ba,nk co�lapse and/or erosion.V�e disagree with the mit�gation proposed for this impact. <br /> We urg�the Coynmission tia accept GEOI.NSITE's recommendation to en.force the City's <br /> required setback as a simple mifiigation.I£the Applicant is nat willing to comply vErit�the <br /> ordinaace,an E�2 should be requ�red to properly eva�.vate#he impacts and an�lyze <br /> alternatives. <br /> 6.8 HydraIogy aud Waxer Quality(c}-���S�xbstaatiauy aiter the egistiag drainage <br /> pattern of the�ite or area,�ncluc�n.g#hrough the alteration of the course of a stream <br /> or river,in a manner,w�irch wouid resui#in substantial erosion or siltation on or off <br /> site?" <br /> Recap - � <br /> 4ur discussion re,garding this iss�e revolved around the potenhal problems with a gabion <br /> retaining wall design that could result in substantia�erosion,eithcr due to ou�fa�impacts <br /> on creek bank instability or to direct failure of the gabion wall.Althaugh not part of the <br /> MND,the City's�eb. 10 st�ff report also recommended alternative designs to reduce t1a�s <br /> pote�itial impact,but a��.e time,f�e Applicant had nat agreed to any design c�anges. <br /> Update since the Feb. 10 hearing . <br /> The Applicant has since submitted a proposal fo tbe City for an atf�ua#e stoxn�wafi:ex plati <br /> that would detain and direct t�e site's stvrm watc�runoff�o#he City's catch bas in at the <br /> cvrner of Finger and El Ca�nino.This plan would eliminate#he need for an outfall or <br /> retaining shuchu�e to be construc�ed in the creel�. <br /> Discussion <br /> While there may be o#i�er moxe effc:ctive or tess exp�r�sive approaches to r�ar�aging th� <br /> site's storm wat3cer than what the Applicant has proposed,the new storm wafex plan,if iti <br /> pxoves feasible;will elimina#e the ne�d.for an outfaU�in the creek and would thus�educe the <br /> po�ntial impacts under this CE{ZA checklist ii�m t�a leve�of nat�signi.fiica�nc�.If t�iis or a <br /> similar stiarm water plan is adop�3.that m�s standards ar,d does not require ou�.ffall <br /> construction in the creek,we would support such a plan azxd drop our claims with respect to <br /> this item. <br /> 6.8 I3ydrology and Water Qua�ty(d)"Substa.ntially a�ter the egi.sting tlrainage <br /> pattern of the�si#e or area,iaclud�ing thrau�h the aiteration of the cours�of a.stream -. <br /> or river,or substantially increas�the rate ar amaunt of surface rt�nuff in a manner, <br /> which would result i�a flooding on or off site?"aad(h)"Pi�ce wi�thin.a 1Q0-year <br /> flood hazard area struc#�xres,which woutd impede or redirect flood flows?" <br />