My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Appendix 1: Methodology checklist <br /> <br />Roles and responsibilities <br />. sampling crew manager-responsible for selecting samples, working with <br />Facility staff and the sampling crew, quality control, and compliance with <br />Facility regulations. <br /> <br />. sampling crew-responsible for sorting samples. <br /> <br />. Facility manager-responsible for coordinating with the sampling crew <br />manager, AUTHORITY, and drivers. <br /> <br />. tipping floor staff-responsible for identifying loads potentially contaminated <br />beyond the acceptable threshold, creating a designated sampling and sorting <br />area, and ensuring segregation of selected loads in that area. <br /> <br />. loader operator(s)-responsible for segregating the selected load from other <br />loads in the designated sampling and sorting area. <br /> <br />o Advanced preparation <br />o Project manager: <br />[] Contact facility manager <br />[I Ask facility manager to update the following employees with the <br />sampling plan: <br />[J Loader operator( s) <br />o Tipping floor staff <br />[j Request safety expectations <br />o Schedule safety training <br />[] Ask if there are any circumstances that may affect the study (Le., <br />weather, animals, site construction, etc.) <br />o Obtain safety gear (Appendix 3) <br />o Check safety gear <br />o Obtain sorting equipment (Appendix 3) <br />D Check sorting equipment <br />o Print tally sheets (Appendix 2) <br />o Print on_ "Rite in the Rain" all-weather paper <br />[] Sampling crew and sampling crew manager <br />[1 Review material list <br />Ll Review data collection forms <br />[] Review unique site requirements <br /> <br />[J Arrival at Facility <br />Sampling crew: <br />[J Arrive at Facility ahead of schedule <br />iJ Participate in any required safety training <br />[J Don safety gear <br />i] Sampling crew manager: <br />[] Arrive at Facility ahead of schedule <br />o Reviews logistics and expectations with MRF manager <br />[1 Participate in any required safety training <br />[J Don safety gear <br /> <br />Facility Agreement, Attachment 2E <br />Contamination Measurement Methodology <br />Page 10 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.