My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o Move the sample into the designated sampling/sorting area <br />o Sort the sample <br />I] Sort Contamination materials into designated baskets <br />[J Assist the sampling crew manager with weighing the baskets <br />o Assist the sampling crew manager with weighing the remainder material <br />IJ Sampling crew manager: <br />[J Record the sample 10 onto the tally sheet <br />[] Assist the sampling crew in moving the sample into the designated <br />sampling/sorting area <br />o Sort the sample <br />IJ Sort all Contamination material into designated baskets <br />o Weigh baskets containing Contamination materials, and record weights <br />on the tally sheet <br />o Ensure homogeneity of materials <br />[] Weigh remainder material and record weights on the tally sheet <br />I] Ensure all Contamination materials are removed <br /> <br />o Sample disposal' <br />I] Sampling crew manager and sampling crew: <br />IJ Dispose of all materials in a designated disposal area <br />[l Loader operator(s): <br />IJ Remove disposed materials when it is safe and convenient <br /> <br />IJ Data management <br />[] Sampling crew manager: <br />[I Review all forms for accuracy and completeness <br />o Tally sheet( s) <br />[I Project manager: <br />[I Check all forms for accuracy and completeness <br />[J Tally sheet(s) <br />[] Copy all data forms <br />I] Store copies separate from the originals <br />fJ Download pictures from camera <br />IJ Provide copies of data for electronic input <br />[] Ensure data entry is checked for accuracy <br /> <br />Facility Agreement, Attachment 2E <br />Contamination Measurement Methodology <br />Page 12 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.