<br />1 <br />2 <br />3 <br /> <br />standards contained in Attachment 2-G), as well as any other performance <br />representations made by the equipment manufacturer to the Authority in the contract <br />referenced in Section 4.02. <br /> <br />4 4.05 DELAY IN ACCEPTANCE <br /> <br />5 If the acceptance test is not completed within 20 days after the end of the shakedown <br />6 period, Contractor will be responsible for additional costs which may be incurred by <br />7 Authority in arranging for Recyclable Materials to be transported to and processed at a <br />8 different location, as well as for decreased revenue from sales of Recyclable Materials. <br /> <br />9 The Contractor is responsible to pay the Authority only for those added transportation <br />10 and processing costs and reduced commodity revenues arising from management and <br />11 supervisory failures, failure to operate the system according to the manufacturer's <br />12 operating protocol, or the inefficiency of the Contractor's sorters and equipment <br />13 operators which may cause the acceptance test period to extend beyond 20 days. <br /> <br />Operating Agreement for Shoreway Center <br /> <br />Page - 9 - <br /> <br />7/30/09 <br />