My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Appendix 1: Methodology checklist <br />Roles and responsibilities <br />. sampling crew manager-responsible for selecting samples, working with <br />Facility staff and the sampling crew, quality control, and compliance with <br />Facility regulations. <br /> <br />. sampling crew-responsible for sorting samples. <br /> <br />. MRF manager-responsible for coordinating with the sampling crew <br />manager, AUTHORITY, and drivers. <br /> <br />. scale house staff-responsible for selecting vehicles, distributing sample <br />placards, and directing drivers towards the sampling area. <br /> <br />. tipping house staff-responsible for identifying loads potentially <br />contaminated beyond the acceptable threshold, creating a designated <br />sampling and sorting area, and ensuring segregation of selected loads in that <br />area. <br /> <br />. loader operator(s)-responsible for segregating the selected load from other <br />loads in the designated sampling and sorting area. <br /> <br />. project manager-responsible for managing the sampling process. <br /> <br />. facility manager-responsible for managing day-to-day operations at the <br />Designated Transfer and Processing Facility. <br /> <br />. Contractor-- responsible for informing the scale house staff of load origin <br />and type and for passing sample placards to the sampling crew manager. <br /> <br />o Advanced Preparation <br />[I Project Manager <br /> <br />o Contact MRF manager <br />o Confirm study dates <br />[] Ask MRF manager to update the following employees with the <br />sampling plan: <br />o scale house staff <br />[I loader operator(s) <br />lJ tipping house staff <br />[1 Contractor <br />[J Any other affected staff <br />Cl Share study quotas <br />[] Request expected traffic volumes <br />[J Request safety expectations <br />o Schedule safety training <br />[] Ask if there are any circumstances that may affect the study (Le., <br />weather, animals, site construction, etc.) <br />[] Obtain safety gear (Appendix 3) <br />!] Check safety gear <br />[J Obtain sorting equipment (Appendix 3) <br />[) Check sorting equipment <br />Develop and print daily sampling quotas (Appendix 2) <br />Develop and print vehicle selection sheets (Appendix 2) <br /> <br />I-I <br />II <br /> <br />Facility Agreement, Attachment 2-H <br />Contamination Measurement Methodology <br />Page 11 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.