My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br />2 <br />3 <br /> <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br /> <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br /> <br />23 <br />24 <br />25 <br />26 <br />27 <br /> <br />28 <br />29 <br />30 <br />31 <br />32 <br /> <br />3. Finally, five (5) parking spaces in the visitor parking area in front of the west <br />entrance to the Transfer Station will be reserved for use of Authority staff and <br />invitees. <br /> <br />C. Collection Contractor's Use of Facilities and Areas. The parties anticipate that Member <br />Agencies will enter into franchise agreements with a Collection Contractor. The <br />Authority will allow the Collection Contractor to make use of the Shoreway Center, as <br />described in this section and Attachment 5. The Collection Contractor will have the <br />exclusive right to occupy and use the northeast parcel of the Shoreway Center <br />designated "Collect.ions Yard/Collections Operations Area" on Attachment 5, as well as <br />the buildings and facilities located in this area. The Collection Contractor shall also <br />have exclusive use of approximately 21,130 square feet of office space designated as <br />"Existing Admin" on Attachment 5, together with the adjacent parking area. <br /> <br />D. Shared Use Areas. In addition, there are areas of the Shoreway Center that Contractor <br />and the Collection Contractor will need to share. The areas of shared utilization <br />include: entry/exit access roads; the fueling area; a bay in the smaller maintenance <br />building yvhich Contractor may use; and the parking area behind the Transfer Station. <br />The Collection Contractor shall have priority to use of fueling facilities; Contractor shall <br />cooperate with the Collection Contractor in the use of other shared areas in order to <br />minimize interference with its operations. If there is a dispute between the Contractor <br />and the Collection Contractor over the shared use areas, the Authority will make a <br />determination as to the extent of use by each, which determination shall be final and <br />binding on each. <br /> <br />Each contractor using the Shoreway Center will pay for costs associated with its use. In <br />cases in which there is a single meter (e.g., water and sewer), the costs will be <br />allocated as the Contractor and the Collection Contractor agree. If they are unable to <br />agree, the Authority will make a determination, which determination shall be final and <br />binding on each. <br /> <br />E. Other Contractors Temporarilv On Site. Contractor is aware that upon the <br />Commencement Date, (1) a general civil construction contractor will be working at the <br />Shoreway Center, and (2) a separate supplier/contractor will be installing recycling <br />equipment in the MRF. Contractor will conduct its operations so as to avoid interfering <br />with the work of either of these contractors. <br /> <br />33 5.06 PERMITS <br /> <br />34 A. The Authority will obtain those new permits and renew those existing permits listed as <br />35 its responsibility on Attachment 6. <br /> <br />36 B. If new operating permits and approvals (or amendments to the permits and <br />37 approvals obtained by the Authority) become necessary by virtue of Contractor's <br />38 operations or changes in operations, Contractor shall obtain them. The Authority will <br />39 assist the Contractor in obtaining permits provided that the operations which give rise to <br />40 the need for them are in compliance with this Agreement. Contractor shall submit a <br />41 draft of all applications for operating permits (and for subsequent renewals or <br />42 modifications thereof) to the Authority for its review and approval prior to filing an <br />43 application with the permitting agency(ies). Contractor shall keep the Authority fully <br />44 informed at all times on the status of all permit applications. Contractor shall apply for <br />45 permits in its own name or in the name of the Authority, as directed by the Authority. <br />46 Contractor shall not agree to permit terms and conditions on any permit which is to be <br />47 issued in the name of the Authority without the prior written consent of the Authority. <br /> <br />Operating Agreement for Shoreway Center <br /> <br />Page - 12 - <br /> <br />7/30/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.