My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />materials including plant material and food scraps. The Contractor will haul to <br />these Designated Disposal and Processing Facilities unless otherwise directed in <br />writing by the AUTHORITY. <br /> <br />B. The AUTHORITY will provide the Contractor 60 days notice if it intends to <br />redirect Solid Waste, C&D, Organic Materials, Bunker Program Materials to a <br />new Designated Disposal Site or Processing Facility. The Contractor's <br />transportation compensation will be adjusted for any haul cost differential, should <br />the AUTHORITY redirect materials to another site or facility <br /> <br />C. Contractor will ensure that the transport trailers are compatible with the tippers <br />and operations at the Designated Disposal Site and Designated Processing <br />Facilities. <br /> <br />D. Contractor must provide sufficient back-up capability (drivers and equipment) in <br />its transfer fleet to minimize disruption during normal business hours due to <br />scheduled preventive maintenance and/or unscheduled equipment breakdown. <br /> <br />5. MATERIALS R~ECOVERY FACILITY OPERATIONS <br /> <br />A. The Contractor will process all Targeted Recyclable Materials delivered by the <br />Collection Contractor, by buyback and drop-off center customers and other <br />customers approved by the AUTHORITY. <br /> <br />B. The Contractor will keep the MRF tipping area open and clear of piles so that <br />material tipping is not hampered and vehicle traffic can safely and efficiently <br />dump loads. <br /> <br />C. Contractor will inspect all inbound materials at the time of delivery and ensure <br />that loads contain only Targeted Recyclable Materials, other materials permitted <br />to be processed at the MRF and allowable levels of contamination. . <br /> <br />D. Residue from the MRF sorting operations will be weighed and recorded prior to <br />being transported to the transfer station. The weight of all Residue (and each <br />individual residue load) removed from the MRF shall be recorded. The <br />Contractor will report the Residue generated by the MRF on a monthly basis to <br />the AUTHORITY. <br /> <br />E. The Residue generated by the Processing System must be below 100/0, provided <br />inbound contamination levels are within the 80/0 commercial and 10010 Single <br />Family Residential threshold levels. Any materials that fall to the floor from the <br />Processing System may be reintroduced to the Processing System for <br />reprocessing. <br /> <br />F. Contractor will transport all Residue to the Designated Disposal Site unless <br />otherwise directed by the Authority. The costs of handling, transporting and <br />disposing of MRF Residue will be the responsibility of the Contractor. The <br />Contractor will not be paid the Transfer Station Fee for Residue handled through <br />the Transfer Station. <br /> <br />G. The Contractor will sort Recyclable Materials to meet the Product Quality <br />Standards Attachment 2-G. <br /> <br />Facility Agreement, Attachment 3 <br />General Operating Standards and Procedures <br />Page 10 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.