My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br />2 ATTACHMENT 11-A <br />3 MARKETING PLAN <br /> <br />4 <br />5 The Contractor will market materials to foreign or domestic buyers, including <br />6 affiliates of the Contractor, to obtain the best long term revenue from the sale of <br />7 recyclable materials. <br />8 <br />9 The Contractor shall check the qualifications of buyers to understand the <br />10 following issues which will be taken into consideration when marketing materials: <br />11 <br />12 (a) Actual end use of recovered materials to ensure they are handled in an <br />13 environmentally sound manner and used in the creation or manufacture of new <br />14 products; and <br />15 <br />16 (b) Reliability of buyer as it relates to arranging for pick up in a timely manner, <br />17 credit worthiness, claims, and other commercial matters. <br />18 <br />19 Within 60 days of the commencement of services, and Quarterly thereafter, the <br />20 Contractor will provide the Authority a Material Marketing Report that includes all <br />21 information required in the Agreement, including Article 9 Contractors Records <br />22 and Reporting and included material quantities, methods of processing, grade of <br />23 commodity produced, transportation method, destination, commodity sales price <br />24 for all materials recovered and diverted ttirough the MRF. <br />25 <br />26 Any materials delivered to the MRF that are not defined as Targeted Recyclable <br />27 Materials are considered to be contamination. However, film plastic that is <br />28 recoverable through the MRF pr.ocessing system as described in Attachments 2A <br />29 and 2C is included in this Marketing Plan. <br />30 <br />31 The Contractor will comply with Commodity Price Assurance Mechanism <br />32 (Attachment 11-8) and Moisture Measurement (Attachment 11-C). <br /> <br />Facility Agreement, Attachment 11A <br />Marketing Plan <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.