Laserfiche WebLink
<br />ATTACHMENT 12C <br /> <br />MODIFICATION OF BASIC COMPENSATION DURING <br />INTERIM OPERATIONS IN RATE YEAR ONE <br /> <br />This Attachment describes how the Contractor's compensation shall be determined for the MRF <br />operations and the Transfer Station operations during the period of Interim Operations. <br /> <br />Prior to the Contractor's start of Facility operations services, the Authority will be constructing a <br />new MRF building and installing new MRF sorting equipment, and retrofitting the Transfer <br />Station building. These construction activities may have an impact of a limited duration on full- <br />scale operations necessitating a modification in basic compensation. <br /> <br />MRF Operations <br />In the event that the MRF building is not ready to process Recyclable Materials at the start of <br />the Operations Agreement on January 1, 2011; the Authority will need to sort Recyclable <br />Materials through an Off-site Processor. The Contractor will receive Recyclable Materials at the <br />MRF and at the Public Recycling Center, but these materials will require loading into a transfer <br />trailer for shipment to the offsite processor( s). The Contractor will not be required to transport <br />the materials to the offsite processor( s). <br /> <br />During this period of interim operations the Contractor will not receive the MRF Fee provided in <br />Section 7.03(B). Compensation will be on a cost plus 92.870/0 basis, up to a monthly not-to- <br />exceed payment of $208,220. Contractor shall submit cost reports and supporting documents <br />such as payroll records to Authority monthly. Interim operations will cease once the equipment <br />installation is complete and the provisions of Section 4.04 are triggered. <br /> <br />Transfer Station Operations <br />I n the event the Transfer Station building is still undergoing construction activities at the start of <br />the Operations Agreement on January 1, 2011, the Contractor will experience operational <br />impacts that will increase its costs to manage the Transfer Station. Such impacts may include <br />longer operating hours for transportation of materials offsite, additional traffic congestion <br />resulting from all customer vehicles tipping on the north side of the Transfer Station building, <br />and enhanced staffing required for floor sorting and litter control. <br /> <br />In order to compensate the Contractor for such additional costs the Transfer Station Fee <br />provided in Section 7.03(A) will be increased by $2.27 per Ton during interim operations. Interim <br />operations will cease once the Authority directs the Contractor to begin using the southern <br />portion of the Transfer Station building. <br /> <br />The dollar amounts in this attachment shall be adjusted by a percentage which represents the <br />1000/0 of the change in the Index: U.S. Department of Labor, Bureau of Labor Statistics, Consumer Price Index <br />- All Urban Consumers, U.S. city average (not seasonally adjusted, all items, base period: 1982-84=100, series no. <br />cuurOOOOsa) between June 2009 and the month(s) in which the interim operations period ends. <br /> <br />Facility Agreement, Attachment 12C <br />Modified Compensation <br />Page 1 of 1 <br />