My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 F. Determination and Pavment of Liauidated Damaaes. Contractor shall provide a <br />2 report that identifies any non-compliance with performance measures listed in <br />3 Attachment 10 (except for compliance with standards which shall be reported as part <br />4 of the Contractor's annual report) and include calculation of the Liquidated Damages <br />5 due. This report shall be accompanied by supporting documentation identifying <br />6 either compliance with or level of non-compliance with the performance measures. <br />7 The report submittal shall be accompanied by a check from the Contractor in the <br />8 amount of the Liquidated Damages due (per Contractor's calculation and self- <br />9 reporting) for the reporting period. <br /> <br />lOG. Proqrams. For each program, provide activity-related and narrative reports on goals, <br />11 milestones, and accomplishments. Contractor shall describe problems encountered, <br />12 actions taken and any recommendations to facilitate progress. <br /> <br />13 H. Summary Assessment. Contractor shall provide a summary assessment of the <br />14 overall materials handling systems from Contractor's perspective relative to financial <br />15 and physical status of the Shoreway Center. Contractor shall assess how well the <br />16 program is operating in terms of efficiency, economy and effectiveness relative to <br />17 meeting all the goals and objectives of this Agreement. Contractor shall provide <br />18 recommendations and plans to improve operations, which highlight significant <br />19 accomplishments and problems. Contractor shall document changes on a monthly <br />20 basis and include monthly documentation in the quarterly reporting. <br /> <br />21 I. Meet and Confer with Authoritv. Beginning on the Commencement Date, and on a <br />22 quarterly basis thereafter, Contractor shall meet with the Authority to describe the <br />23 services performed at the Shoreway Center and the progress of each active <br />24 Diversion Program. Contractor shall document the results of the programs on a <br />25 monthly basis, including the tonnage diverted by material type, the end use or <br />26 processor of the diverted materials and the cost per ton for transporting and <br />27 processing each type of material and other such information requested by the <br />28 Authority necessary to evaluate the performance of each program. <br /> <br />29 J. Addition and Chanaes to Proarams. The Authority shall have the right to terminate a <br />30 program if in its sole discretion the Contractor is not cost effectively achieving the <br />31 program's goals and objectives. Prior to such termination, the Authority shall meet <br />32 and confer with Contractor for a period of up to 90 days to resolve the Authority's <br />33 concerns. Thereafter, the Authority may utilize a third party to perform these <br />34 services if the Authority reasonably believes the third party can improve on <br />35 Contractor's performance and/or cost. Notwithstanding these changes, Contractor <br />36 shall continue the program during the meet and confer period and, thereafter, until <br />37 the third party takes over the program. <br /> <br />38 9.06 ANNUAL REPORT REQUIREMENTS <br /> <br />39 The Annual Report shall be in the form of the Quarterly Reports and shall provide the <br />40 same type of information as required pursuant to Section 9.05 summarized for the <br />41 preceding four quarters. The Annual Report shall also include a complete inventory of <br />42 equipment used to provide all services, and a list of Contractor's personnel used to <br />43 operate the Shoreway Center. <br /> <br />44 9.07 INSPECTION OF RECORDS <br /> <br />45 The Authority, and its agents selected by the Authority, shall have the right, during <br />46 regular business hours, to conduct unannounced on-site inspections of the records and <br /> <br />Operating Agreement for Shoreway Center <br /> <br />Page - 35 - <br /> <br />7/30/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.