My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br /> <br />ARTICLE 11 DEFAULT AND REMEDIES <br /> <br />2 11.01 EVENTS OF DEFAULT <br /> <br />3 Each of the following shall constitute an event of default ("Contractor Default"): <br /> <br />4 A. Contractor fails to perform any of its obligations under Sections 4.03 and 4.04 of <br />5 Article 4 or Articles 5 and 6 of this Agreement and its failure to perform is not cured <br />6 within ten (10) days after written notice from the Authority, provided that neither <br />7 notice nor opportunity to cure applies to events described in subsections C through <br />8 H. <br /> <br />9 B. Contractor fails to perform any of its obligations under any other provision of this <br />10 Agreement and its failure to perform is not cured within fifteen (15) days after written <br />11 notice from the Authority, provided that if the nature of the breach is such that it will <br />12 reasonably require more than fifteen (15) days to cure, Contractor shall not be in <br />13 default so long as it promptly commences the cure and diligently proceeds to <br />14 completion of the cure, and provided further that neither notice_. nor opportunity to <br />15 cure applies to events described in subsections C through H. <br /> <br />16 C. Contractor ceases to provide Shoreway Center operations or Solid <br />17 Waste/Recyclable Materials transportation services for a period of two (2) <br />18 consecutive business days for any reason within the Contractor's control, including <br />19 labor unrest such as strike, work stoppage or slowdown, sickout, picketing, or other <br />20 concerted job action by Contractor's employees or others. <br /> <br />21 D. Contractor files a voluntary petition for relief under any bankruptcy, insolvency or <br />22 similar law. <br /> <br />23 E. An involuntary petition is brought against Contractor under any bankruptcy, <br />24 insolvency or similar law which remains undismissed or unstayed for ninety (90) <br />25 days. <br /> <br />26 F. Contractor fails to furnish a replacement bond or a continuation certificate of the <br />27 existing bond not less than ninety (90) days before expiration of the performance <br />28 bond, as required by Section 10.03 or fails to maintain all required insurance <br />29 coverages in force. <br /> <br />30 G. Contractor fails to provide reasonable assurance of performance when requested by <br />31 the Authority under this Agreement. <br /> <br />32 H. A representation or warranty contained in Article 3 proves to be false or misleading in <br />33 a material respect as of the date such representation or warranty was made. <br /> <br />34 I. Contractor makes any other material misrepresentation to the Authority in <br />35 discharging any of its obligations under this Agreement. <br /> <br />36 11.02 RIGHT TO SUSPEND OR TERMINATE UPON DEFAULT <br /> <br />37 A. Upon any Contractor Default, the Authority may terminate this Agreement or <br />38 suspend it, in whole or in part. Such suspension or termination shall be effective <br />39 thirty (30) days after the Authority has given notice of suspension or termination to <br />40 Contractor, except that such notice may be effective in a shorter period of time, or <br />41 immediately, if the Contractor Default is one which endangers the health, welfare or <br />42 safety of the public, such as the failure to process Solid Waste or Recyclable <br />43 Materials and arrange for their prompt disposal or recovery. Notice may be given <br /> <br />Operating Agreement for Shoreway Center <br /> <br />Page - 42 - <br /> <br />7/30/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.