My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LIST OF ATTACHMENTS <br /> <br />1. Definffions <br />2-A. List of MRF Sorting Equipment Showing Manufacturer, Model Number, <br />Description <br />2-B. Latest Version of Site Plan for Shoreway Recycling and Disposal Center <br />2-C. Plan Drawings of New MRF Sorting Equipment <br />2-D. MRF and Transfer Station Materials Flow Diagram <br />2-E. Contamination Measurement Methodology: Single Loads <br />2-F. MRF Equipment Acceptance Test <br />2-G. Product Quality Standards <br />2-H. Quarterly Contamination Measurement Methodology <br />3. General Operating Standards and Procedures <br />4. Contractor's Implementation and Operating Plan <br />5-A. General Site Map/Shared Use Facility <br />5-B. Detailed Site and Building Plans and Parking Areas <br />6. Permits <br />7. Hazardous Waste Exclusion Plan (HWEP) <br />8-A. Authority-Supplied Stationary Equipment <br />8-B. Contractor-Supplied Equipment List <br />9. Contractor Staffing Plan <br />10. Liquidated Damages <br />11-A. Materials Marketing Plan <br />11-B. Price Assurance Mechanism <br />11-C. Moisture Measurement <br />12-A. Procedure for Initial Rate Adjustment Process <br />12-8. Sample Calculation of Initial Rate Adjustment Process <br />12-C. Modification of Basic Compensation During Interim Operations in Rate Year One <br />12-D. Final Cost Forms <br />13-A. Procedure for Annual Rate Adjustment Process <br />13-8. Sample Calculation of Annual Rate Adjustment Process <br />14. Self-Haul Reconciliation Formula <br />15. Reports to be Provided by Contractor <br />16. Performance Bond and Continuation Certificate <br />17. Guaranty <br />18. Contractor's Safety Plan <br />19. Self-Haul Diversion Plan <br /> <br />Operating Agreement for Shoreway Center <br /> <br />7/30/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.