My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Yerba Buena Engineering and Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Yerba Buena Engineering and Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 4:02:28 PM
Creation date
3/12/2021 4:02:09 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Yerba Buena Engineering and Construction, Inc.
PROJECT NAME
ADA Compliant curb ramps and complete sidewalk repairs
RMP File Number
304
Date
2/25/2021
MO Ref
20-211
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and to make decisions or actions binding on City, and shall have sole signature authority on behalf <br />of City. <br />C. City may assign all or part of the Project Manager's rights, responsibilities and duties to a <br />Construction Manager, or other City Representative. <br />3.02 CONTRACTOR'S PROJECT MANAGER AND OTHER KEY PERSONNEL <br />Jeremy Konaris <br />A. Contractor has designated r as its Project Manager to act as Contractor's <br />Representative in all matters relating to the Contract Documents. <br />B. Contractor has designated the following other Key Personnel for the Project: <br />Name <br />Fernando Carrillo <br />Xavier Collins <br />Sergio Meza <br />Position <br />Superintendent [See Doc. 00 7200 Para. 8.01.6] <br />Project Engineer <br />Foreman <br />ARTICLE 4 LIQUIDATED DAMAGES FOR DELAY IN COMPLETION OF WORK <br />4.01 LIQUIDATED DAMAGE AMOUNTS <br />A. As liquidated damages for delay Contractor shall pay City One Thousand dollars ($1,000.00) for <br />each Day that expires after the time specified herein for Contractor to achieve Substantial <br />Completion of the entire Work, until achieved. <br />4.02 SCOPE OF LIQUIDATED DAMAGES <br />A. Measures of liquidated damages shall apply cumulatively. <br />B. Limitations and stipulations regarding liquidated damages are set forth in Document 00 7200 <br />(General Conditions). <br />ARTICLE 5 CONTRACT DOCUMENTS <br />5.01 Contract Documents consist of the following documents, including all changes, Addenda, and <br />Modifications thereto: <br />Document 00 5100 <br />Document 00 5200 <br />Document 00 5210 <br />Document 00 5500 <br />Document 00 6113.13 <br />Document 00 6113.16 <br />Document 00 6290 <br />Document 00 6325 <br />Document 00 6530 <br />Document 00 6536 <br />Document 00 7200 <br />Document 00 7300 <br />Document 00 7301 <br />Document 00 7316 <br />Document 00 7380 <br />Document 00 9113 <br />Notice of Award <br />Agreement <br />CDBG Federal Requirements <br />Notice to Proceed <br />Construction Performance Bond <br />Construction Labor and Material Payment Bond <br />Escrow Agreement for Security Deposits <br />Substitution Request Form <br />Release of Claims <br />Guaranty <br />General Conditions <br />CDBG Requirements <br />Supplemental General Conditions <br />Supplementary Conditions — Insurance and <br />Indemnification <br />Apprenticeship Program <br />Addenda <br />CDBG CURB RAMP PROJECT 005200-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.