Laserfiche WebLink
SCHEDULE OF BID PRICES <br />All Bid items, including lump sums, unit prices and alternates (if any), must be filled In completely. Bid items <br />are described in Section 01 1100 (Summary of Work). Quote in figures only, unless words are specifically <br />requested. <br />Item <br />Description <br />Estimated <br />Unit <br />Unit Price <br />Total Item <br />Quantity <br />Cost <br />1 <br />Mobilization/Demobilization <br />1 <br />LS <br />(Maximum 2.5 % Of Total Bid Price) <br />15,000.00 <br />15,000.00 <br />2 <br />Traffic Control 0 <br />/o Of T <br />(Maximum 5.0 Total Bid Price) <br />1 <br />LS <br />30,000.00 <br />30,000.00 <br />2 <br />Construction Surrey <br />(Maximum 2.5 % Of Total Bid Price) <br />1 <br />LS <br />15,000.00 <br />15,000.00 <br />4 <br />Remove Existing Concrete Sidewalk <br />And Install New Sidewalk <br />2000 <br />SF <br />18.00 <br />36,000.00 <br />5 <br />Install Curb Ramps <br />77 <br />Fro <br />5,500.00 <br />423,500.00 <br />6 <br />Remove And Replace Asphalt <br />956 <br />SF <br />25.00 <br />23,900.00 <br />Concrete Paving —AC 12" Plug <br />7 <br />Relocate Existing Stormdrain Inlet <br />5 <br />EA <br />5,000.00 <br />25,000.00 <br />8 <br />Adjust Utility Box To Grade <br />29 <br />EA <br />250.00 <br />7,250.00 <br />9 <br />Cobble Stone Island (Including <br />trench cover) <br />90 <br />SF <br />140.00 <br />12,600.00 <br />10 <br />Thermoplastic Stripe 12" White or <br />500 <br />LF <br />25.00 <br />12,500.00 <br />Yellow <br />Total Bid Price: <br />600,750.00 <br />Total Bid Price: <br />Six Hundred Thousand Seven Hundred Fifty Dollars <br />(Indicate Bid Price in Words) <br />In case of discrepancy between the Unit Price and the Total Item Cost set forth for a unit basis item, the <br />unit price shall prevail and shall be utilized as the basis for determining the lowest responsive, responsible <br />Bidder. However, If the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any <br />cause, or is omitted, or is the same amount as the entry in the 'Total Item Cost" column, then the amount <br />set forth in the 'Total Item Cost" column for the item shall prevail and shall be divided by the estimated <br />quantity for the item and the price thus obtained shall be the Unit Price. <br />CDBG CURB RAMP PROJECT 004113-2 <br />