My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.03.22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.03.22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 12:21:02 PM
Creation date
3/18/2021 4:58:35 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/22/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
546
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.13. - Page 27 of 37 <br />Consultant shall develop all necessary workshop materials and Spanish speaker staff <br />from the Consultant team shall be present in this workshop. <br />City will coordinate with neighborhood associations and other community organization to <br />inform the public about this workshop. <br />Task 4.8. Summary of Community Outreach Efforts <br />Consultant shall develop a second slide deck and document and summarize all the <br />community outreach activities that were conducted, including the workshops, surveys, <br />pinnable map, project website, presentations to elected officials, and other methods and <br />tools. Critical elements of the slide deck summary shall be incorporated into the Draft <br />Bicycle and Pedestrian Master Plan and Vision Zero Action Plan documents. The full <br />contents of the slide deck could be included as an attachment. <br />BASE DELIVERABLES: <br />• Draft and final versions of the Outreach Plan memorandum <br />• Summary of comment results from related planning efforts <br />• Presentation materials and other meeting support for up to two (2) City Council or <br />Council sub -committee meetings <br />• Online tools: Project website content, pinnable map, e -newsletters content and <br />draft social media posts and announcements <br />• All necessary materials for the community workshops: agendas, presentations, <br />handouts, posters, comment sheets, summary notes <br />• Two (2) online surveys <br />• Community outreach summary slide deck suitable for agency and stakeholder <br />presentations with graphics and maps showing the outcomes <br />Task 4.9. Plan Fact Sheets (Optional3) <br />At the launch of the project, Consultant shall create English and Spanish language fact <br />sheets (draft and final versions). The fact sheet will provide key information about the <br />project. <br />Task 4.10. Stakeholder Meetings (Optional) <br />If needed, Consultant shall attend and help City staff present at up to two (2) stakeholder <br />meetings, whether virtually or in-person, and develop all necessary presentation <br />materials. Stakeholders may include neighborhood associations, Parent-Teacher <br />3 Consultant may perform the optional tasks after City authorization. <br />REV: 03-04-21 PR <br />51 <br />ATTY/AGR.2021.047/Fehr & Peers (Bicycle & Pedestrian Plan and Vision Zero Action P) (Page 21 of 31) <br />
The URL can be used to link to this page
Your browser does not support the video tag.