Laserfiche WebLink
<br />Page 2 of 2 <br /> <br />copies of permits listed below by the date of commencement of work. The work to be <br />done shall conform to the requirements of all permits: <br /> <br />a. The California State Department of Fish and Game Project Conditions. <br />Condition 2 requires that a three-foot buffer at the toe of each bank be left <br />undisturbed. Condition 4 prohibits heavy equipment from operating from <br />within the channel. Conditions 7 and 9 discuss silt control measures. This <br />permit is effective through <br /> <br />b. The Regional Water Quality Control Board (RWQCB) Waste Discharge <br />Requirement (WDR) Waiver Conditions. The Board did not recommend <br />issuance of a 401 Water Quality Certification for this project due to its low <br />threat to water quality. The Board requests that the City of Menlo Park <br />comply with all conditions in the WDR during the 2009 maintenance <br />activities. <br /> <br />c. The U.S. Army Corps of Engineers (USACE) 404 authorization is not <br />required if disposal is off-site and there are no violations of the Endangered <br />Species Act. This determination is effective through October 3, 2010. <br /> <br />TRAFFIC CONTROL - POSTING AND NOTIFICATION AND MAINTAINING TRAFFIC: <br />City of Menlo Park shall provide traffic control devices, e.g. cones, barricades, warning <br />signs, etc., and other incidentals to control automobile traffic safely around the sites. <br />The City of Menlo Park shall close the sidewalk next to Atherton Channel and re-direct <br />pedestrian traffic during the days mobilization and work is in progress and while spoils <br />are de-watered. The City of Redwood City shall handle worksite safety and vehicle <br />traffic control if it is required, which shall comply with all City standards. Construction <br />operations shall be conducted in such a manner to cause as little inconvenience to <br />vehicle traffic as possible. <br /> <br />CONSTRUCTION HOURS AND NOISE: Work hours shall be between 6:00 AM to 6:00 <br />PM, Monday through Friday, and 6:00 AM to 6:00 PM, Saturdays, Sundays and <br />Holidays, except when otherwise specified by the City Engineer. The City of Redwood <br />City shall comply with City of Menlo Park Noise Ordinance 8.06. <br /> <br />WORKER ACCESS TO FACiliTIES: The City of Redwood City shall provide access to <br />toilet facilities for its workers. There are no public facilities near the work site. <br /> <br />POLLUTION CONTROL: The City of Redwood City shall follow all City NPDES <br />requirements and Best Management Practices (e.g., straw or fiber rolls, storm drain <br />filters) to keep sediment and miscellaneous litter and trash out of the Channel and storm <br />drains. The City of Redwood City shall keep City right of way clean of sediment and <br />debris, except for areas used for de-watering of spoils. After removal of de-watered <br />spoils, the City of Redwood City shall leave the area in as clean a condition as it was <br />before the work. <br /> <br />U:\!WasteH20\STORM\Other Cities Work OrdersWenlo-Park\FV 2009-10 Documents\EXHIBIT A- Scope.doc <br />8/24/2009-1:08 PM <br />