Agmt09 SpenCon Construction (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2012 1:22:56 PM
Creation date
9/8/2009 8:59:56 AM
Metadata
Fields
Template:
Agreement
Contractor Name
SpenCon Construction
PROJECT NAME
2009-2010 Cost Shared Sidewalk Repair
RMP File Number
304
Date
8/31/2009
MO Ref
09-154, 10-183, 12-110
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1. Contractor shall achieve Substantial Completion of the Work within 365 <br />Calendar Days from the date the Contract Time commences to run. <br /> <br />B. Liauidated Damaaes <br />1. City and Contractor recognize that time is of the essence of this Agreement <br />and that City will suffer financial loss in the form of lost revenues, contract <br />administration expenses (including project management and consultants' <br />expenses), delay and loss of public use, if the Work is not completed within <br />the time specified in paragraph III.A.1 above plus any extensions thereof <br />allowed in accordance with the Contract documents. Consistent with Section <br />00700 (General Conditions), Contractor and City agree that because of the <br />nature of the Project, it would be impractical or extremely difficult to fix the <br />amount of actual damages incurred by City because of a delay in completion <br />of the Work. <br /> <br />2. Accordingly, City and Contractor agree that Contractor shall pay City $500.00 <br />(Five hundred and 00/1 00 Dollars) for each Day that expires after the time <br />specified in Paragraph III.A.1 of this Section 00520 for Contractor to <br />achieve Substantial Completion, until such date as contractor achieves <br />Substantial Completion. <br /> <br />C. Liquidated damages for delay shall only cover and be in lieu of the actual damages <br />suffered by City as a result of delay referenced above. Liquidated damages shall <br />not cover the cost of completion of the Work, damages resulting from defective <br />work, cost of temporary replacement facilities, damages suffered by others who <br />then seek to recover their damages from City (for example, delay claims of other <br />contractors or subcontractors), and defense costs thereof. <br /> <br />D. Contract Period and Price Adjustments <br />The contract shall cover one (1) fiscal year period from approximately August 1, <br />2009 through A. This contract may be extended by the City for up to four (4) <br />consecutive years at the discretion and approval of the City. The City shall notify <br />the Contractor in writing of the intent to extend the contract by June 1st of the <br />current contract year. The price may be increased up to 5% from the preceding <br />year based on approval by the City. The City in its discretion may base <br />increases in the contract price on relevant fluctuations in the Construction Cost <br />Index for the San Francisco Bay Area in the Engineering News Record. <br /> <br />E. The Contractor shall prepare all bonds and insurance documents in a timely <br />manner to facilitate the contract extension. <br /> <br />IV. CITY'S ENGINEER AND REPRESENTATIVES <br />Reserved <br /> <br />V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> <br />In order to induce City to enter into this Agreement, Contractor makes the following <br />representations and warranties: <br /> <br />A. Contractor has visited the Site and has examined thoroughly and understood the <br />nature and extent of the Work, Site, locality, actual conditions, as built conditions, <br /> <br />2009-2010 COST SHARED SIDEWALK REPAIR PROJECT <br /> <br />2 <br />