My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 SpenCon Construction (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 SpenCon Construction (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2012 1:22:56 PM
Creation date
9/8/2009 8:59:56 AM
Metadata
Fields
Template:
Agreement
Contractor Name
SpenCon Construction
PROJECT NAME
2009-2010 Cost Shared Sidewalk Repair
RMP File Number
304
Date
8/31/2009
MO Ref
09-154, 10-183, 12-110
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2009-2010 Cost Shared Sidewalk Replacement Program Bid Summary <br /> CITY OF REDWOOD CITY � <br /> NAME OF CONTRACT:Cost Shared SIW Proiect Ameod•3 <br /> Item EST. <br /> No. Qly- Unit Description of Item Unit Price Item Cost Unit Price a^e^d.1 Unit a^e^d-Z Amend.2 cost Ame�d.3 <br /> Priee+3.19� �m�t plus 1.8% �m Cost <br /> Mobilization,Vaffic control, <br /> 1 1 LS notifica6on and other incidentals $500.00 $500.00 $506.65 $522.81 $522.81 $532.22 $532.22 <br /> 2 7,500 SF Removeexistingsidewalk $1.50 $11.250.00 $1.52 $1.57 $11,759.79 $1.60 $11,971.47 <br /> 3 7,500 SF Constructconcretesidewalk $7.�0 $53,250.00 $7.19 $7.42 $55,663.01 $7.56 $56,664.94 <br /> 4 100 SF Remove existing sidewalk for $1.50 $150.00 $1.52 $1.57 $156.84 $1.60 $159.67 <br /> installation of rubber sidewalk <br /> 5 3,200 SF Remove existing driveway $1.50 $4,800.00 $1.52 $1.57 $5,019.00 $1.60 $5,109.34 <br /> 6 3,200 SF Construct c�aete driveway $g_pp $25,600.00 $8.11 $8.36 $26.767.98 $8.52 $27,249.80 <br /> Remove existing curb ar�d gutter <br /> 7 800 LF $3.00 $2,400.00 $3.04 $3.14 $2,509.50 $3.19 $2,554.67 <br /> Construct concrete curb and <br /> 8 800 LF 9utter $31.00 $24.800.00 $31.41 $32.41 $25,931.48 $33.00 $26,398.25 <br /> 9 900 SF Remove and replace asphaf[ $6.85 $6,165.00 $6.94 $7.16 $6,446.27 $7.29 $6,562.31 <br /> pavement <br /> 10 203 SF Remove Walkway Material $1.00 $203.00 $1.01 $1.05 $212.26 $1.06 $216.08 <br /> �� 5 � ConstrudWheelchairRamp- g�,g50.00 $9,250.00 $1,874.61 $1,934.40 $9,672.02 $1,969.22 $9,846.12 <br /> City Detail C-9,Case C <br /> 12 40 LF Repair imigation system $4,pp $160.00 $4.05 $4.18 $167.30 $4.26 $170.31 <br /> 13 36 CY Additional sub-base excavation $40.00 $1,440.00 $40.53 $41.82 $1,505.70 $42.58 $1,532.80 <br /> 14 20 EA Drain Line Installation $40.00 $800.00 $40.53 $41.82 $836.50 $42-58 $851-56 <br /> t5 2 EA Tree Grate Insfallation $85.00 $170.00 $86.13 $88.88 $177.76 $90.48 $180.96 <br /> Total base bid item 1 through $150,000.49 <br /> 15 E140,938.00 <br /> S:lNew PW File StructureW RigM of WaylSidewa&MaintenancelAgreementslAmend 3 to 09_10 50.50 Prxes pWS 1.8 percent� <br />
The URL can be used to link to this page
Your browser does not support the video tag.