My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Wagstaff and Associates (3/4/2010- Name Changed see sticky note)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Wagstaff and Associates (3/4/2010- Name Changed see sticky note)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2010 11:16:57 AM
Creation date
9/10/2009 12:56:32 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wagstaff and Associates
PROJECT NAME
Environmental Services - Downtown Precise Plan
RMP File Number
304
Date
9/8/2009
MO Ref
RDA MO 09-12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. John Wagstaff <br />May 18, 2009 <br />Page 2 of 3 <br /> <br />2006 DPP EIR and the recent counts. This comparison showed several turning <br />movements with substantial changes between 2005 and 2007-2008 - with some <br />movements increasing and decreasing by as much as 50%. Thus, it cannot be <br />conclusively shown that traffic conditions have not changed since the 2006 DPP EIR <br />was prepared. However, data collection efforts are costly and may result in time <br />delays for completion of the study if traffic counts cannot be collected before school is <br />out for the summer on June 18, 2009. <br /> <br />3. Forecasting methods should be consistent with the General Plan and Mid-Point <br />Technology Center EJR. The forecasting methods currently being applied for the <br />General Plan Update and Mid-Point Technology Center are different from those used <br />in the 2006 DPP EIR. The two current EIR are using the Redwood City's travel <br />demand forecasting model, while the 2006 DPP EIR used a manual assignment of <br />pending project traffic volumes plus an annual growth rate. These two methodologies <br />could result in substantial differences between future year forecasts. If the resulting <br />forecasts are substantially different and the number of study locations is reduced <br />(see assumption 1 above), it is possible that there may be impacts at intersections <br />that were dropped from the analysis. <br /> <br />The fixed-fee cost to conduct the TIA as described in the scope of work is $69,700, which does <br />not include new traffic counts or field observations. This fee estimate includes all professional and <br />support staff time, as well as direct expenses, and will be billed on a monthly basis. Attendance at <br />two project-level meetings and two public hearings is also included in this proposal. If there are <br />requests for services outside the attached scope of work, we will make a written budget request <br />prior to beginning work. Additional services will be conducted upon written authorization and <br />billed on a time-and-materials basis according to the attached rate schedule (Attachment B). Our <br />standard terms (Attachment C) apply to this proposal; the terms are valid for a period of 30 days. <br /> <br />We estimate that we can complete the proposed scope of work and submit a draft report for your <br />review within sixteen weeks of receipt of a signed contract and traffic counts and all relevant <br />background information. Please sign below to indicate authorization to proceed. <br /> <br />To prepare a comprehensive (analysis of all 42 locations), free-standing report with updated <br />existing conditions, we estimate the fee would be $110,000 plus $18,480 for new vehicle, bicycle, <br />and pedestrian counts at 28 intersections. We estimate that these additional tasks would add four <br />(4) weeks to the schedule, for a total of 20 weeks. <br /> <br />Should you have any questions or need any additional information, please do not hesitate to call <br />us. We look forward to working with you on this project. <br /> <br />Sincerely, <br /> <br />FEHR & PEERS <br />Jason Nesdahl. CE70682 <br />Is licensed by the Board for Professional <br />Engineers and Land Surveyors <br /> <br />ACCEPTED BY: <br /> <br />Wagstaff & Associates <br />Signature: <br /> <br />'J1'i~ 4~ <br /> <br />for Jason Nesdahl, P.E. <br />Senior Transportation Engineer <br /> <br />Printed Name: <br /> <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.